My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-06-28
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-06-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/16/2012 4:04:41 PM
Creation date
6/24/2004 4:04:09 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
6/28/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C.o . 1 - � � � <br /> The scope of work for this project consists of construction and modifications of culvert <br /> entrance concrete wall structure; installation of new galvanized steel trash rack, grates <br /> and bearing steel frames; construction of new rip-rap slope protection, and construction <br /> of new concrete masonry unit (CMU) wall. <br /> The three (3) bids received at the bid opening on June 16, 2004, are summarized <br /> below: <br /> No. Bidder Bid Amount <br /> 1. Bianchi Construction — San Jose, CA $76,298.00 <br /> 2. Trinet Construction — San Francisco, CA $77,000.00 <br /> 3. Power En ineerin — Alameda, CA $78,222.00 <br /> The low bid of $76,298.00 is 4.63% lower than the Engineer's Estimate of $80,000 for <br /> the cost of construction, and is considered a good and responsive bid. <br /> A complete copy of the Agreement is available for review in the City Clerk's Office. <br /> Alternative <br /> Reject all bids and deal with the storm drain problem, which would cause the inlet to <br /> easily clog and overflow, and subsequently, damage to the claimants' properties. <br /> Fiscal Impacts <br /> Funds in the amount of $156,788.00 are appropriated in the FY 2003-2004 Capital <br /> Improvement Program Budget from the Capital Projects Fund. <br /> � <br /> ,.. � l a / ;; <br /> �_ ������i���s��c� ��� � - �(, <br /> M. Saber Sarwary .Joel Pa ersc6n Ed Everett <br /> Senior Civil Engineer Manag , C�rigineering & Construction City Manager <br /> MSS/JBE:ss <br /> Slibrary/reports/sabedAward Gamett Park Storm dreln CulveR <br />
The URL can be used to link to this page
Your browser does not support the video tag.