Laserfiche WebLink
C.o . 1 - � � � <br /> The scope of work for this project consists of construction and modifications of culvert <br /> entrance concrete wall structure; installation of new galvanized steel trash rack, grates <br /> and bearing steel frames; construction of new rip-rap slope protection, and construction <br /> of new concrete masonry unit (CMU) wall. <br /> The three (3) bids received at the bid opening on June 16, 2004, are summarized <br /> below: <br /> No. Bidder Bid Amount <br /> 1. Bianchi Construction — San Jose, CA $76,298.00 <br /> 2. Trinet Construction — San Francisco, CA $77,000.00 <br /> 3. Power En ineerin — Alameda, CA $78,222.00 <br /> The low bid of $76,298.00 is 4.63% lower than the Engineer's Estimate of $80,000 for <br /> the cost of construction, and is considered a good and responsive bid. <br /> A complete copy of the Agreement is available for review in the City Clerk's Office. <br /> Alternative <br /> Reject all bids and deal with the storm drain problem, which would cause the inlet to <br /> easily clog and overflow, and subsequently, damage to the claimants' properties. <br /> Fiscal Impacts <br /> Funds in the amount of $156,788.00 are appropriated in the FY 2003-2004 Capital <br /> Improvement Program Budget from the Capital Projects Fund. <br /> � <br /> ,.. � l a / ;; <br /> �_ ������i���s��c� ��� � - �(, <br /> M. Saber Sarwary .Joel Pa ersc6n Ed Everett <br /> Senior Civil Engineer Manag , C�rigineering & Construction City Manager <br /> MSS/JBE:ss <br /> Slibrary/reports/sabedAward Gamett Park Storm dreln CulveR <br />