My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt15 Pavement Coatings Co.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2015
>
Agmt15 Pavement Coatings Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2015 10:33:00 AM
Creation date
9/11/2015 10:00:49 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Pavement Coatings Co.
PROJECT NAME
2014-2015 Slurry Seal Project
RMP File Number
304
Date
9/10/2015
MO Ref
15-113
Sticky Note
ID:
1
Text:
Faithful Performance Bond pages 5-8.
Payment Bond pages 9-12.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� , � ���Il��'� <br /> AGREEMENT <br /> for the <br /> City of Redwood City <br /> 20142015 SLURRY SEAL PROJECT <br /> THIS AGREEAAENT, made this�day of 15, by and beiween <br /> Pavemerrt Coatings Co.whose plac�of bus ness is at 102 � San Sevaine Way,Jurupa Valley, CA <br /> 91752, hereinafter called "CONTRACTOR°, and the Cityr of Redwood Cit�r, a Charter City and <br /> municipal oorpo�ation of the State of Califomia, hereinafter referred to as"CITY". <br /> In consideration of the mutual covenarrits hereinafter set forth, Corrtractor and City agree as <br /> follows: <br /> I. WORK <br /> A. Corrtractor shall complete all Work specfied in the Contract documents, in <br /> acxordance with the Speaficatlons, Drawings, and all other terms and condifions of <br /> the Contract documer�ts. <br /> II. CONTRACT SUM <br /> A. City shall pay the Corrtractor as the °Contract Sum" for comple�an of Work in <br /> accordance with the Contract documents, as the amount of Four Hundred Sixty <br /> Three Thousand Five Hundred Sixty Five and No/100 Dollars ($463,565.00), <br /> camputed in accoMance with Contractor's Accc�pted Bid �epesa4 dated, July 2, <br /> 2015, which Bid Rfepesel is incorporated herein by refe�enos thereto as if fully set <br /> forth. <br /> B. The Corrtract Sum is all inclusive and includes all Work; all federal, state, and local <br /> taxes on materials and equipment, and labor fumished by Cotmactor, its <br /> subcontractors, subcansultants, architects, engineers, and vercdors or otherwise <br /> arising out of Contracto�'s performanoe of the Work, induding any increases in any <br /> such taxes during the term of this Agneemen� and any duties, fees, and royalties <br /> imposed with respect to any materials and equipmerrt, labor or services. The taxes <br /> oovered hereby indude (but are not limited to) occupational, sales, use, excise, <br /> unemployment, FICA, and income taxes,customs,du�es,and any and all othe�taxes <br /> on any item or service that is part of the Work, whether such taxes are normally <br /> induded in the price of such item or service or are normally stated separately. <br /> Notwithstanding the foregoirtg,each party shall bear such state or local inventory,real <br /> property, personal property or fixtures taxes as may be properly assessed against it <br /> by applicable taxing authorities. <br /> III. CONTRACT TIME AND LIQUIDATED DAMAGES <br /> A. Contractor shall c:omplete the Wotic within the following Schedule reflecting the date <br /> the Cor�tract Time commences to run as set fath in Sedion 00550 (Notice to <br /> Proceed)and Secction 00700(General Conditions); and <br /> 1. Contractor shall achieve Sulxstandal Completian of the Work within thirty-flve <br /> (35)Calendar Days from the date the Cor�tract Time commencas to run. <br /> B. Liquidated Damages <br /> AGREEMENT <br /> 20142015 SLURRY SEAL PROJECT <br />
The URL can be used to link to this page
Your browser does not support the video tag.