My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt15 Pavement Coatings Co.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2015
>
Agmt15 Pavement Coatings Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2015 10:33:00 AM
Creation date
9/11/2015 10:00:49 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Pavement Coatings Co.
PROJECT NAME
2014-2015 Slurry Seal Project
RMP File Number
304
Date
9/10/2015
MO Ref
15-113
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_��,�,,,�,�„� _____ _ _ _ _. <br /> 1. City and Corrtractor recognize that time is of the essencae of this�reement <br /> and that City will suffer flnancial loss in the form of lost revenues, co�act <br /> administration expenses (including project management and consultants' <br /> expenses), delay and loss of public use, if the Work is not completed within <br /> the time specified� in Raragraph IIIA1 above plus any extensions thereof <br /> allowed in aoconlanoe with the Contract documents. Consistent with Saction <br /> 00700 (General Condi�ons), Contractor and City agree that because of the <br /> natur+e of the Project, it.would be impractical or extremely difficult to fix the <br /> amount of actuaf damages incun�ed by City because of a delay in oompletion <br /> of the Work. <br /> 2. Accordingly, City and Contractor agree that Contractor shall pay City$500 for <br /> each Day that e�ires after the time speafied in Paragraph IlIA.1 of this <br /> Sedion 00520 for Contractor to achieve Substantial Completion, until such <br /> date as contractor achieves Substantial Completion. <br /> C. Liquidated damages for delay shall only cover and be in lieu of the ac�tual damages <br /> sufFered by City as a result of delay referenced above. Liquidated damages shall not <br /> cover the cost of comple�on of the Wot1c�damages resulting from defedive work�cflst <br /> of temporary replacement faali�es, damages suffered by others who then seek to <br /> recover their dama�ges from City (for example, delay Gaims of other conhactors or <br /> subcoritractors), and defense costs thereof. <br /> N. CITY'3 ENGINEER AND REPRESENTATIVES <br /> Reserved <br /> V. CONTRACTOR'S REPRESENTATIONS AND WARRANTIES <br /> In order to induce Cily to er�ter irito this Agreement, Contractor makes the follawing <br /> representations and warranties: <br /> A. Contractor has visited the Site and has examined thoroughly and understood the <br /> nature and exterrt of the Work,Site,locality,actual oondiaons,�buift condidons,and <br /> all local oondi�ons and federal, state and local laws and regulations that in any <br /> manner may affect cost,progress, performance or fumishing of Work or which relate <br /> to any aspect of the design and the means, metl�ods, techniques, sequences or <br /> procedures of construction to be employed by Conh�actor and safet�r precautions and <br /> programs inaderrt thereto. <br /> B. Corrtractor has e�camined thoroughly and understood all reports of exploration and <br /> tests of subsurface conditions, drawings or reports, available for design and <br /> construction purposes, of physical c�ndi�ons, or which may be ap�rerrt at the Site <br /> and accepts the determination sst forth in these Sections and Secdon 00700(General <br /> Conditions) of the limited extent of the irrformation corrtained in these Sections upon <br /> which the Contractor may be entitled to rely. Cor�tractor agrees that exoept for the <br /> informaa�tion so identified, Coritractor does not and shall not rely on any other <br /> i�rFormafion contained in these Sections. <br /> C. Contractor has considered the physical condi�ons at or contiguous to the Site or <br /> otherwise which may affect the cost, progress, performance or fumishing of Work, as <br /> Contractor conside�s necessary for the perfamance or fumishing of Work at the <br /> Contrad Sum, within the Contract Time and in accordance with the other terms and <br /> conditions of Cor�tract documents, including speaflcally the provisions of the General <br /> Conditions. <br /> AGREEMENT <br /> 20142Q15 SLURRY SEAL PROJECT <br />
The URL can be used to link to this page
Your browser does not support the video tag.