My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord04 2264
RedwoodCity
>
City Clerk
>
Ordinances
>
2000-2009
>
2004
>
Ord04 2264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2012 9:36:15 AM
Creation date
6/29/2004 12:46:52 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Agency Type
City Council
Date
6/28/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Appendix B - Project Conditions <br /> storage shall be submitted for review and approval by the City 61. The project shall be plumbed for the use of recycled water for all <br /> prior to approval of the Final Map for each phase of develop- outdoor landscape irrigation, with separate meters dedicated to <br /> ment. If such storage is provided on the site, the City will not such use. For nonresidential interior uses, such as for cooling <br /> require capacity in excess of the project's total need at buildout, towers and toilets, structures shall be dual-plumbed in full com- <br /> unless the applicant concurs. Storage shall be constructed and pliance with SB 2095 and applicable plumbing codes, and with <br /> accepted by the City prior to occupancy of each phase of devel- separate water meters. <br /> opment. Additional storage may be required at subsequent <br /> phases if required by State law. Wastewater <br /> 58. The applicant shall build new water distribution facilities (for 62. Design and construction of all proposed public and private waste- <br /> potable and recycled water), within the project site and from the water improvements shall comply with all applicable Redwood <br /> project site to transmission lines on the west side of US101 and/ City Engineering Standards and policies in effect at the time of <br /> or at the eastern end of Whipple Ave., including necessary pipe Tentative Map approvals. <br /> upgrades and improvements in the area of Main Street and Con- <br /> vention Way to ensure proper flow. Plans for such water facility 63. The applicant shall contribute their proportional share of funds <br /> improvements shall be submitted to and must be approved by to the City to purchase (or develop) SBSA dry weather flow <br /> the City prior to Final Map approval for the initial phase of de- treatment capacity (SBSA Stage 2 or future stages) adequate to <br /> velopment, and the improvements shall be constructed prior to serve the project. The required contribution shall be made prior <br /> occupancy of the initial phase of development. to approval of the Final Map for the initial phase of develop- <br /> ment. <br /> 59. Allan-site water and fire protection system facilities, including <br /> water lines and fire hydrants, shall be dedicated to and owned 64. The applicant shall upgrade SBSA's Influent Lift Station and <br /> by the City. Appropriate on-site easements shall be provided for Maple Street Pump Station to develop increased transmission <br /> City maintenance from public roads to the lines, hydrants and capacity. Design of the required upgrades must be submitted for <br /> water meters. review and approval by the City and SBSA prior to approval of <br /> the Final Map for the initial phase of development. Construc- <br /> 60. Water use shall be monitored by the applicant and reviewed by tion of the required upgrades shall be completed and accepted <br /> the City at each phase of the project to determine consistency by the City and SBSA prior to the issuance of building permits <br /> with projected demand levels and availability of water supply. for the initial phase of development. <br /> A program for monitoring (that may include separate onsite pri- <br /> vate meters) must be submitted to and approved by the City 65. The applicant shall design and construct an on-site sewer collec- <br /> prior to approval of the Final Map for the initial phase of devel- tion system and pump station that shall convey sewage to the . <br /> opment. Adjustments in water availability, if deemed necessary treatment plant by pumping to the SBSA 48-inch sewer system <br /> by the City, shall be considered upon subsequent requests for force main. Design of the required improvements shall be sub- <br /> Tentative Map or Planned Community Permit approvals, and/or mitted for review and approval by the City and SBSA prior to <br /> building permits. approval of the Final Map for the initial phase of development. <br /> - 98 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.