My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord04 2264
RedwoodCity
>
City Clerk
>
Ordinances
>
2000-2009
>
2004
>
Ord04 2264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2012 9:36:15 AM
Creation date
6/29/2004 12:46:52 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Agency Type
City Council
Date
6/28/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> ! <br /> Appendix B - Project Conditions <br /> I <br /> ¡ <br /> , Construction of required improvements shall be completed and cluding filing a Notice of Intent and Storm Water Pollution Pre- <br /> i accepted by the City prior to the issuance of building permits for vention Plan (SWPPP) with the Board for each phase of the de- <br /> I the initial phase of development, except that the on-site system velopment. Site design measures shall include storm water treat- <br /> I <br /> shall be developed only as necessary to serve each phase. ment and source control best management practices (BMPs) to <br /> ! be applied as part of the SWPPP. Plans shall be submitted for <br /> ì <br /> I 66. The on-site sewer collection system shall be privately owned review and approval by the City and the Regional Board prior to <br /> and maintained. approval of the Final Map for each phase of development. <br /> J <br /> 67. The sewer Pump Station and force main will be owned and main- 72. The applicant shall obtain all permits and shall construct mea- <br /> J tained by the City. Proper easements shall be granted by the sures for flood protection to the satisfaction of the City. The <br /> I applicant in conjunction with the Final Map approval for the design of such flood protection measures shall be submitted for <br /> initial phase of development. review and approval by the City prior to approval of the Final <br /> I Map for the initial phase of the development for each subarea <br /> 68. Wastewater generation shall be monitored by the applicant and (South CenterlPeninsula Marina and North Point/Pete's Harbor), <br /> I the City to determine consistency with projected generation and necessary flood protection measures must be installed to <br /> levels, to assess sewer use fees and sewer capacity at each phase the satisfaction of the City prior to issuance of building permits <br /> I of development. A program for monitoring (that may include for the initial phase of development for each subarea. <br /> I separate onsite private meters) shall be submitted to and ap- <br /> proved by the City prior to issuance of building permits for the 73. The applicant shall conduct on-going water quality and sedi- <br /> I initial phase of development. Adjustments in sewer fees, if ment testing during the course of construction. A monitoring <br /> deemed necessary by the City or if requested by the applicant, program shall be developed, to the satisfaction of the City, prior <br /> I shall be considered upon subsequent requests for Tentative Map to the approval of the Final Map for the initial phase of develop- <br /> I or Planned Community Permit approvals. ment. Monitoring reports shall be provided to the City with any <br /> subsequent Tentative Map applications, and upon any written <br /> I Drainage request of the City. <br /> I 69. Storm water drainage collection shall be designed to comply 74. The applicant shall conduct a hydraulic analysis to verify that <br /> ., with all relevant City of Redwood City Standards and NPDES marina inlets will operate properly, and shall submit such analy- <br /> regulations. sis to the City for review prior to approval of the Final Map for <br /> I the initial phase of the development. <br /> 70. The on-site storm water drainage collection system shall be pri- <br /> I vately owned and maintained. 75. The applicant shall conduct an analysis to determine the effect <br /> of a reduction in the Redwood Creek tidal prism on the channel <br /> I 71. The applicant shall meet all of the requirements of the City's geometry, and will submit such analysis to the City for review <br /> I National Pollutant Discharge Elimination System (NPDES) per- prior to approval of the Final Map for the initial phase of the <br /> mit with the State Regional Water Quality Control Board, in- development. <br /> I <br /> - 99 - <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.