My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord04 2264
RedwoodCity
>
City Clerk
>
Ordinances
>
2000-2009
>
2004
>
Ord04 2264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2012 9:36:15 AM
Creation date
6/29/2004 12:46:52 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Agency Type
City Council
Date
6/28/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Chapter II - Development Standards & Urban Design Guidelines <br />1. Freeway Frontage Area - New development should parallel the initial phase PC Permit application, and may be modi- I <br /> construction of the Blomquist Street Extension and Redwood fied in subsequent applications subject to City review and <br /> Creek Bridge, to create a gateway to the Bayfront, and approval. <br /> project an attractive image along US 101. <br />2. South Center Area - This is the heart of the Precise Plan, II. Building Height & Setbacks <br /> therefore development of the South Center Area shall be <br /> completed prior to completion of development of the North A. MAXIMUM BUILDING HEIGHT - Building height is defined <br /> Point Area. as the average vertical distance measured from adjacent <br /> sidewalk(s) and/or publicly-accessible walkways to the top of <br /> An initial phase project consisting of a maximum of 25% of building wall, parapet, and/or eave line. Pitched, domed, and/or <br /> the total housing units may be constructed prior to develop- other special architectural roof forms are recommended and may <br /> ment of the community hub. Development exceeding 25% qualify for a height exception; see c., Maximum Height Excep- <br /> of the total number of housing units proposed shall require tions. See diagrams on pages 32 and 33. <br /> development of the required recreational park/open space <br /> and initiation of development of the community hub. The 1. Maximum Base Building Height - Maximum building height <br /> community hub is a key element of the Precise Plan's Trans- shall generally be 80', but may range from 60' to 120' to <br /> portation and Circulation policies, affecting development provide variety, subject to Planning Department review. <br /> phasing and potential buildout. It shall be completed prior Lower buildings should generally be located adjacent to <br /> to development of 65% of the total number of housing units public areas; e.g., outer esplanade, Bair Island Road, etc. Base <br /> proposed. buildings shall be stepped back between a height of 35' and <br /> 50' to provide visual interest and maintain a pedestrian scale <br />3. Affordable Housing - Affordable housing, consistent with along streets and ways. <br /> the provisions contained in Chapter IV, shall be provided in <br /> proportion to the overall number of units developed in a 2. Maximum Residential Tower Height - A tower building is <br /> given phase. defined as any building or portion of a building exceeding <br /> the base building height of 80'; see B, Tower Stepbacks, be- <br />4. Development Phasing Plan - The developer/applicant shall low. Maximum tower height shall be 240' in the North Point <br /> submit a development phasing plan for City approval, con- subarea and 205' in the South Center subarea, per FAA re- <br /> sistent with Precise Plan objectives and policies. This Phas- quirements. <br /> ing Plan shall indicate the total number of development <br /> phases proposed, and where, when, and how much devel- 3. Percentage Area of Tower Buildings - Total floorplates of all <br /> opment is proposed in each phase. Individual development tower buildings shall not exceed a maximum of 7.5% of the <br /> phases should be able to stand alone functionally and aes- total Precise Plan land area of 46.5 acres; see diagram on <br /> thetically, if for some reason subsequent phases are not de- page 33. <br /> veloped. The Development Phasing Plan shall accompany <br />Final Plan· June 2004 - 30 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.