Laserfiche WebLink
<br /> ! <br /> í <br /> Chapter III - Circulation, Transportation & Capital Improvements <br /> <br /> ! above, to provide access to development on the west side of e. Recycled Water - All non-residential structures or spaces <br /> ¡ Bair Island Road. At some point in the future, this crossing shall be dual-plumbed for indoor use of recycled water <br /> , could be relocated to align with the "scenic entrance drive" for toilet flushing and applicable, self-contained cool- <br /> i <br /> I intersection concept contained in the Bayfront Study ing systems. Such plumbing shall be separate from po- <br /> I table plumbing and shall be served by separate recycled <br /> I E. Utilities and Services - Major facilities are summarized below. water meters, in full compliance with SB 2095 require- <br /> Additional information and detail is provided in supplemental ments and plumbing codes. <br /> 1 reports, including the Marina Shores Village Project Draft ElR. Ad- <br /> i <br /> ditional requirements may be added as part of conditions of All exterior landscaping and decorative water features <br /> ~ J approval, prior to approval of a development permit or final shall be designed for the use of recycled water in full <br /> I map, and/or per other City procedures compliance with California Title 22 requirements, and <br /> shall be served by recycled water meters which are sepa- <br /> I 1. Water Service rate from indoor recycled water meters and all potable <br /> water meters. <br /> I a. Water Supply - The City will enter the full amount of <br /> the estimated project water demand into the City of f. Landscaping - shall conform to city water conservation <br /> I Redwood City's water supply planning process, but the guidelines. <br /> City retains full discretion in the allocation of water sup- <br /> ply. The adequacy of the water supply to serve indi- 2. Sewer Service <br /> vidual, subsequent project phases will be determined at <br /> the time of issuance of building permits. a. Treatment and Transmission Capacity - The City will <br /> I purchase SBSA dry weather flow treatment capacity and <br /> I b. Emergency Storage and Fire Protection - Build and dedi- shall be reimbursed by Precise Plan Area development. <br /> cate City water tank(s), associated pump station and The SBSA Influent lift Station and Maple Street Pump <br /> I tank site to serve the project. Station should be upgraded to increase transmission <br /> capacity. <br /> I c. Water Distribution - Build new water distribution sys- <br /> tem, within project site and from project site to supply b. Local Collection System - Construct on-site sewer col- <br /> .., lines on the west side of US 101. Provide necessary pipe lection system and pump station, and convey to the <br /> J upgrade/improvement in the area of Main and Conven- treatment plant by pumping to the SBSA 48-inch sewer <br /> tion to ensure proper flow. system force main. The on-site sewer collection system <br /> I will be privately owned and maintained. The pump sta- <br /> d On-Site Water and Fire Protection System - Shall be City- tion and force main will be owned and maintained by <br /> I owned and City-maintained, with appropriate ease- the City. <br /> I ments provided for construction and maintenance ac- <br /> cess. <br /> J <br /> - 73 - Final Plan - June 2004 <br /> I <br />