My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord04 2264
RedwoodCity
>
City Clerk
>
Ordinances
>
2000-2009
>
2004
>
Ord04 2264
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2012 9:36:15 AM
Creation date
6/29/2004 12:46:52 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Agency Type
City Council
Date
6/28/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Chapter IV - Implementation <br /> Development within the Precise Plan Area shall be approved by a the developer shall meet and confer with City staff about <br /> Planned Community (PC) Permit issued in accordance with Article refinements to the Concept Plans. <br /> 52 of the Redwood City Zoning Ordinance. This PC Permit may <br /> cover the entire Precise Plan Area, or only a part. All PC Permit appli- 2. Depending upon results of the Concept Plan Review, appli- <br /> cations shall demonstrate consistency with the goals, development cants may elect to continue refining plans with City staff or <br /> standards and urban design guidelines of the Precise Plan. proceed to prepare and submit a PC Permit application and <br /> start the formal application process. Plan refinement with <br /> PC Permits for all development not in process at the time of adop- City staff is strongly recommended as a means to work out <br /> tion of this Precise Plan shall be reviewed by staff and recommended Precise Plan inconsistencies prior to submitting a PC Permit <br /> to the Planning Commission for final approval, consistent with Ar- application. <br /> ticle 52 of the Zoning Ordinance. The Planning Director will refer <br /> the submittal's building elevations to the Architectural Review Com- B. PC Permit Content - The Application for the PC Permit shall <br /> mittee (ARC) for their review advice on building architecture. include a cover letter detailing the request and a narrative de- <br /> scription of the proposed application. The application shall also <br /> Submittals for PC Permits made after adoption of this Precise Plan include the following: <br /> shall consist of sufficient detail to enable staff to determine confor- <br /> mity with the policies of this Precise Plan. Applications for PC per- l. A site plan showing the proposed phase of development <br /> mits shall contain the information and conform with the process within the context of the buildings/structures then completed <br /> described below. In the event that the City later amends the content and those still to be built. The site plan shall show the lay- <br /> of and process for PC Permits, these amended requirements shall out of buildings, parking and open space areas and shall also <br /> control. include pedestrian walkways, freestanding signs, driveways, <br /> and all existing and proposed streets. The site plan shall also <br /> A. PC Permit Process show all existing and proposed utilities, including power <br /> poles and lines, fire hydrants, irrigation controls and any <br /> 1. For each PC Permit, the developer shall submit Concept Plans other above ground utility of any kind. The site plan(s) shall <br /> to City staff for review. These Concept Plans may consist of be scaled and fully dimensioned and shall specify the loca- <br /> diagrammatic sketches and tracings sufficient to communi- tion of property lines, setbacks and easements. Site plans <br /> cate the developer's basic intentions. Concept Plans shall involving building, open space and parking area relation- <br /> be to-scale and must at a minimum indicate building heights, ships shall be designed by either a licensed Architect or Land- <br /> entrances, basic site layout, parking supply and configura- scape Architect. Additional site plan information including <br /> tion and off-site building and access relationships. Concept grade elevations, slope, and drainage and infrastructure de- <br /> Plans will not constitute formal application. City staff shall tails necessary to establish or identify the proposed improve- <br /> have no less than 15 and no more than 45 working days to ments shall be prepared by a registered Civil Engineer. <br /> review and comment on the Concept Plans prior to the de- <br /> veloper submitting a formal application, during which time 2. Building plans shall specify the overall area of each building <br /> and/or unit as well as the proposed uses of all rooms. Build- <br /> Final Plan - June 2004 - 78 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.