My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res15 15445
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2015
>
Res15 15445
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2015 2:32:41 PM
Creation date
9/30/2015 10:09:13 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/21/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/21/2015 <br /> MITIGATION MONITORING OR REPORTING PROGRAM <br /> FINGER AVENUE N1NE-LOT PLANNED DEVELOPMENT PROJECT <br /> Timeframe for Resp for,b'''ty Oversight of <br /> Impact Mitigation Implementation Implementation <br /> Implementation <br /> GEOLOCY AND SOILS <br /> The soils on the site Mitigation Measure GEO-2: Development of the proposed Prior to issuance Building plans City Building <br /> are susceptible to project in compliance with a final site-specific,design-level of a grading or submitted to the Official <br /> liquefaction. geotechnical report will ensure that construction of the proposed building permit City by the <br /> Development of lands project would not expose people or structures to potential project applicant <br /> subject to substantial adverse effects from seismic-related ground failure, shall incorporate <br /> liquefaction the foundation <br /> represents the �ncluding liquefaction. design <br /> potential to expose parameters <br /> people or structures Prior to issuance of a grading or building permit,the project identified in the <br /> to potential applicant shall submit to the City for review and approval a final geotechnical <br /> substantial adverse site-specific,design-level geotechnical report,to be prepared by a report <br /> effects,including the ��censed professional.The geotechnical report shall include <br /> risk of loss,in u recommendations for grading,avoidance of settlement,the effects <br /> j ry,or of expansive soils,and differential settlement of infrastructure and <br /> death. buildings.The report shall also identify the specific design <br /> parameters for foundations systems to ensure that such systems <br /> will not be affected by liquefaction that could occur on the site. <br /> Building plans submitted to the City shall incorporate the <br /> foundation design parameters identified in the evaluation. <br /> Less Than Significant with Mitigation. <br /> Finger Avenue Nine-Lot Planned Development Project June 2012 <br /> Mitigation Monitoring or Reporting Program Page 2 <br /> Page 3 of 21 RESO.#15445 <br /> MUFF#613 <br />
The URL can be used to link to this page
Your browser does not support the video tag.