My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Res15 15445
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2010-2019
>
2015
>
Res15 15445
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2015 2:32:41 PM
Creation date
9/30/2015 10:09:13 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/21/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
09/21/2015 <br /> MITIGATION MONITORINC OR REPORTING PROGRAM <br /> FINGER AVENUE NINE-LOT PLANNED DEVELOPMENT PROJECT <br /> Im act Timeframe for Responsibility <br /> P Mitigation far Oversight of <br /> Implementation Implementation <br /> Implementation <br /> Structures set back Mitigation Measure GEO-3: The structure on Lot 3 is sited less Prior to issuance Building plans City Building <br /> less than 30 feet from than 30 feet from the toe of the Cordilleras Creek embankment, of a grading or submitted to the Official <br /> creek toe of bank are therefore the foundation shall be supported on a drilled pier and building permit City by the <br /> at risk from sudden grade beam foundation systems,designed as recommended in the project applicant <br /> bank failure.A small BAGG Geotechnical Report.The project proposes to construct shall incorporate <br /> portion of the home homes on Lots I-4 on pier and grade beam foundations,even the foundation <br /> proposed on Lot 3 when further than 30 feet from toe of bank,to ensure that design <br /> would encroach construction of the proposed project would not expose people or parameters <br /> within 30 feet of the structures to potential substantial adverse effects,including the identified in the <br /> toe of bank.As risk of loss,injury,or death involving landslides or ground geotechnical <br /> proposed,structures failures. report <br /> on proposed L,ots 1, <br /> 2,and 4 would be Less Than Significant Impact with Mitigation <br /> sited a minimum of <br /> 30 feet from the toe <br /> of the creek bank. <br /> Creek bank erosion Mitigation Measure GEO-4: To prevent ongoing erosion from <br /> has occurred at the These erosion prior to CA Department of <br /> affecting Lot 3,the project developer proposes to install bank protection Fish and Game. <br /> rear ofproposed Lot erosion protection measures consisting of minimally invasive installation,the <br /> 3,and is ex ected to measures shall be developer shall <br /> P construction techniques as recommended by the Regional Water installed by the If CA DFG <br /> continue in the future, Quality Control Board in"A Primer on Stream and River enter into a determines a <br /> thereb causin loss developer prior to gtreambed <br /> Y g Protection for the Regulator and Program Manager"(Technical sale of Lot 3 Streambed <br /> of usable rear yard Reference Circular W.D.02-#1).These protection measures shall Alteration Alteration <br /> area and damage to be installed by the developer prior to sale of Lot 3.Prior to Agreement with Agreement is not <br /> the typical backyard installation,the developer shall enter into a Streambed Alteration the CA necessary,the re- <br /> improvements that Agreement with the CA Department of Fish and Game(if Department of vegetation plan <br /> could be placed determined necessary by CA DFG).The developer shall Fish and Game sl�all be reviewed <br /> (if determined by the Director of <br /> Finger Avenue Nine-Lot Planned Development Project June 2012 <br /> Mitigation Monitoring or Reporting Program Page 3 <br /> Page 4 of 21 <br /> RESO.#15445 <br /> MUFF#613 <br />
The URL can be used to link to this page
Your browser does not support the video tag.