Laserfiche WebLink
SAT for the structure would commence. As with the LAT, the SAT is a repetition of the FAT <br /> steps associated with that site's (facility) functionality. <br /> The duration of the SAT spans a total of 72 hours and as with the other testing components, <br /> is attended by the Owner/Operator and the S&B project manager. Successful SAT <br /> completion shall be a precondition for commercial operation of that site/facility. <br /> Operationa!Demonstration Test(OD1) <br /> The Operationa) Demonstration Test (ODT) is to test the PARCS system in its entirety. The <br /> duration of the test is thirty (30) days and is conducted by closely monitoring system operation <br /> during the test period. It includes a thorough analysis of the system produced data and the <br /> subsequent reporting of that data. With successful completion of the ODT, the system is <br /> deemed to be complete and accepted by the operator. <br /> EXHIBIT B— LIST OF PROJECT DELIVERABLES AND PRICING <br /> The total amount payable by the City for work shall not exceed $706,690.63, if the optional CCN <br /> installation is included.The cost breakdown is set out below: <br /> REV: 09-10-15 VR <br /> Page 41 of 61 <br /> ATTY/AGR.2015.217/Scheidt& Bachmann USA, Inc. Parking Garage Equipment <br />