Laserfiche WebLink
materials and work required to be sealed when submitted to City or other jurisdictional <br /> authorities. <br /> 3. Contractor shall review work and submittals of all sub-tier designers, vendors, suppliers, and <br /> subcontractors for conformance with the Work of this section. <br /> 4. City reserves right to review Contractor's Work for conformance with these specifications. <br /> Where City determines Work does not conform, City may direct Contractor to implement <br /> changes satisfactory to City. <br /> B. Future System Expansion: <br /> 1. Parking equipment and CMS shall be easily expandable to accommodate additional garages, pay <br /> stations, features and configurations. Installed PARCS shall be capable of, but not limited to, <br /> expansions/enhancements listed below: <br /> a. Integration with the real-time parking app ParkerT"' (www.streetline.com) <br /> b. Integration with real-time parking information signs(vendor to be determined) <br /> c. Integration with parking guidance systems (PGS) (vendor to be determined). <br /> C. Work Included: <br /> 1. Design, fabricate, deliver, and install all new parking system equipment as described in this <br /> Section. This includes the new pay stations, entry stations, exit credit card stations, parking <br /> gates,validators, cameras,CMS and related equipment. <br /> 2. Comply with all applicable Federal,State and Local laws, codes and standards and Americans <br /> with Disabilities Act. <br /> 3. Review plans and specifications to be certain that all functional requirements, as described, <br /> are provided with equipment to be supplied. <br /> 4. Provide all submittals as specified herein. <br /> 5. Coordinate final and precise layout of pay stations. <br /> 6. Provide and install all necessary network equipment,electronics and related equipment for <br /> communication network and intercom system. <br /> 7. Attend periodic meetings, provide written schedules as requested, and coo�dinate and <br /> schedule work with City staff. <br /> 8. Test equipment in accordance with Part 3—Execution of the PARCS Technical Specification. <br /> 9. Provide operating manuals, maintenance manuals, spare parts, stock items and training <br /> sessions as specified herein. <br /> 10. Provide City all information about communication/internet security requirements for credit <br /> card and cell/smart phone processing within four weeks after notice to proceed. The credit <br /> card processing/clearinghouse interface shall be compatible with the City's current credit card <br /> processor-Wells Fargo Bank. <br /> 11. Upon written notice by the City Engineer,the City may elect to have the Contractor install the <br /> closed circuit television (CCN} system and all necessary supporting infrastructure (e.g. <br /> conduits, wiring) for one or both parking garages. If the City does not elect to have the <br /> Contractor do the installation, the Contractor will coordinate installation of the CCTV <br /> equipment that it is providing,with the City's designee. <br /> REV:09-10-15 VR <br /> Page 11 of 61 <br /> ATTY/AGR.2015.217/Scheidt 8� Bachmann USA, Inc. Parking Garage Equipment <br />