My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt15 David J. Powers & Associates, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2015
>
Agmt15 Under 60K
>
Agmt15 David J. Powers & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2015 8:41:23 AM
Creation date
10/12/2015 8:41:22 AM
Metadata
Fields
Template:
Agreement
Contractor Name
David J. Powers & Associates, Inc.
PROJECT NAME
Preliminary review EIR YMCA and Senior Center at Red Morton park
RMP File Number
304.5
Date
10/9/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This analysis will alsc� be us�d a�the basis for the com�reher3siv�; air quality anaiy�is ihat will be <br /> required for the CEt�A analysis. <br /> Nvise <br /> Similar to air c�uality, tlie pri�n�ry noise isst�e woi�lci be: effects of aut�r�zobile nc�i�e (including <br /> revvin� en�incs, car horns, car �larn�s, and dc�c�r slanls) Eron� the �arking structur� on n�:arby <br /> res�dences or3 Valota Road. Illtn�-���rth� c�Rodkin wi11 co���ple�� a preliininary review of th�e sif� <br /> �lan and prc�vid�. a k�rief desc-ription c�f pot�ntial unpacts and a reco�nmend�tian af design <br /> cc�nsiderati�ns and��or nliti�ation �measures related t� the parkin� strtietur�. Na nais� <br /> rneasurements are propt�seci aC tliis fiicne. An�bient �i�ise; leuels will be cietermined as part c�f th� <br /> GL:QA analy$is. <br /> 7`his analysis will ais�a t�e usec� �5 the l�a.�is fc��- t}�e c+nm�rehensive ncaise anaEysis that will t�e <br /> required it�r the CEQA analysis. <br /> Bir�fr�,�icrxl R`�snurccss- Trees <br /> Tl�e �z-c�ject site is surrtjGCn�ied app��oxitnrrtely '�0 to ]00 mature trees ���hiuh provide habit��t fc�r <br /> wil�ilife and sc-rec:nin�for tti�ne;art�y r�5i�ie;rlc.LS. It is�s::un-��ci that nlast of the trees will n���i tc� <br /> be ren�aved to im�Eernent the proposec� projecc. In addition, trees nat slateci for r�maval b�t <br /> within c�r acljacent tU the construitic�n •r..one have t13e p�tential tc� be dama�ed durin� construstion. <br /> Uc�facrrcrl�Cllrs (c�.rtific;d arborist) will cotn}�lete �survey of a11 trees within th�: area of impact fpr <br /> the project. Each tre� v��ill be identified by size anc� speci�s and the ov�;rall health of each trs:e <br /> ��lill be deterrnir�ed. Th�. tree survey, with maps and phc�tc�s, will be camplcted consist�nt with <br /> C.ity standards. The preliminary analy�is will 3ddr�ss t}le �otential loss c�t trees and the impact <br /> c�n tl�e loc�l habitat anci th� nearby resicienccs. <br /> Th� �tree survey, �s proposed, rvill be suf`fici�nt fc�r the C�EQ�1 ai7alysis. No addition�l technical <br /> w�urk ��ill hc:rec�uired. <br /> Crilf�iral Resc��arces�—/listc�ric Btrildir�gs <br /> �I'l�c City has p1-avidud I)Jf'&� wit}� a hi�tc�ric analysis �nd peer re�°iew c�f the Vetcrans Mc;tnnrial <br /> ��iilciing, '1'hese r�pc�rts w�ill be iaseci for the pretin�in�ry assessznent. <br /> If it is c�eterrtr�ined that additiana( information is reqt�ired to cc�mpletc,the CEQ,�1 review, DJP&r� <br /> r�vi11 include a certi�ed a�•chitecturt�l lustarian vn a��r prUj�ct te�in to conaplete any additivnal <br /> revietv. <br /> REV:49-Q4-1S MlG <br /> Page 11 of 12 <br /> ATTYIAGR,2015.2161David J. Powers&Assvciates <br />
The URL can be used to link to this page
Your browser does not support the video tag.