My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2015-10-26 Study and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2015
>
AgdaPkt 2015-10-26 Study and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2015 10:03:49 AM
Creation date
10/22/2015 7:26:56 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
10/26/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.B. - Page 13 Exhibit C <br /> 1061 Douglas Ave <br /> Stormwater Treatment Measure Operation and Maintenance <br /> Inspection Report to the Sequoia Union High School District California <br /> This report and attached Inspection and Maintenance Checklists document the inspection <br /> and maintenance conducted for the identified stormwater treatment measure(s) subject to <br /> the Maintenance Agreement between the City and the property owner during the annual <br /> reporting period indicated below. <br /> I. Property Information: <br /> Property Address or APN: 1061 Douglas Avenue,Redwood City,CA 94063 <br /> Property Owner: Sequoia Union High School District <br /> II. Contact Information: <br /> Name of person to contact regarding this report: Walter Haub,Facilities Director <br /> Phone number of contact person:650-369-1411 ext 22241 Email:whaub @seq.org <br /> Address to which correspondence regarding this report should be directed: <br /> Sequoia Maintenance and Transportation Facility, 1090 Mills Way, Redwood City, CA <br /> 94063 <br /> III. Reporting Period: <br /> This report,with the attached completed inspection checklists,documents the inspections <br /> and maintenance of the identified treatment measures during the time period from <br /> to <br /> IV. Stormwater Treatment Measure Information: <br /> The following stormwater treatment measures(identified treatment measures)are located <br /> on the property identified above and are subject to the Maintenance Agreement: <br /> Identifying Type of Treatment Measure Location of Treatment Measure on the <br /> Number of Property <br /> Treatment <br /> Measure <br /> Area 1 Bio-Retention Area(4068 sf) Centered along easterly property line and <br /> adjacent to Douglas Avenue <br /> Area 2 Rio-Retention Area(1873 st) Along the southerly property line and <br /> adjacent to the pedestrian vehicle parking <br /> lot <br /> Page 1 O&M Inspection Report <br /> ATTY/AGR.2015.209/1061 Douglas Ave <br />
The URL can be used to link to this page
Your browser does not support the video tag.