Laserfiche WebLink
6.1 .B. - Page 14 <br /> Exhibit C <br /> 1061 Douglas Ave <br /> Area 3 Rio-Retention Area(2600 sf) Along the easterly property line and <br /> adjacent to the pedestrian vehicle parking <br /> tot. Also along the southerly property line <br /> and adjacent to the bus parking lot <br /> Area 4 Bio-Retention Area(921 sf) Along the westerly property line and <br /> adjacent to the bus parking lot <br /> Area 5 Bio-Retention Area(2468 sf) Along the northerly property line and <br /> adjacent to the buss parking lot <br /> V. Summary of Inspections and Maintenance: <br /> Summarize the following information using the attached Inspection and Maintenance <br /> Checklists: <br /> Identifying Date of Operation and Maintenance Activities Additional Comments <br /> Number of Inspection Performed and Date(s)Conducted <br /> Treatment <br /> Measure <br /> VI. Sediment Removal: <br /> Total amount of accumulated sediment removed from the stormwater treatment <br /> measure(s)during the reporting period: cubic yards. <br /> How was sediment disposed? <br /> ❑ landfill <br /> Page 2 O&M Inspection Report <br /> ATTYIAGR.2015.20911061 Douglas Ave <br />