My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt15 Erler & Kalinowski Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2015
>
Agmt15 Under 60K
>
Agmt15 Erler & Kalinowski Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2016 2:13:18 PM
Creation date
12/10/2015 9:40:06 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Erler & Kalinowski Inc.
PROJECT NAME
Water Supply Planning 2015 Urban Water Management Plan
RMP File Number
304.5
Date
12/9/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-��.► 1\I <br /> other sources, as directed by the City, and will summarize the available information and its <br /> implications in the UWMP. <br /> Evaluation of Supalv versus Demand <br /> Per CWC Section 10635(a),the 2015 UWMP must include an assessment of the reliability of the <br /> Cit�/s water supply as compared to projected demands during future normal, dry, and multiple <br /> dry water years. Based on information developed as part of the 2015 UWMP, EKI will compare <br /> the Cit�/s projected water supply to projected water demand in five-year increments for the <br /> next 25 years during various year types. To the extent that there are significant shortfalls or <br /> uncertainties identified, EKI will bring these issues to the Cit�s attention so that they can be <br /> addressed prior to drafting the Draft UWMP. <br /> Conduct Workshon#2 <br /> Workshop#2 will include a presentation of the information identified above and will consist of <br /> a one to two hour meeting with all appropriate stakeholders as identified by the City. During <br /> Workshop #2 EKI will obtain input from the City and stakeholders regarding water supply <br /> projections, current and projected usage of recycled water, water source quality, and the <br /> evaluation of projected water supplies as compared to projected demands. EKI will work with <br /> the City in order to determine how best to include this information into the Draft UWMP. <br /> Task 3 Delivera6les: <br /> • Draft supply projections including descriptions of water availability and reliability <br /> • Draft description of current recycled waier usage and expansion efforts <br /> • Draft evaluation of water qualify by source <br /> • Draftsupply versus demand projedion comparisons <br /> • Workshop#2 agenda and minutes <br /> Task 4- Prepare and Submit Administrative Draft and Final 2015 UWMP <br /> Task 4 includes the preparation of the written UWMP documents for the City and public review, <br /> incorporation of feedback,and subsequent preparation and submission of a final 2015 UWMP. <br /> Draft UWMP <br /> EKI will prepare a Draft UWMP based upon the comments received during the workshops and <br /> distribute the document to the City and identified stakeholders. The Draft UWMP should <br /> already contain information that has been reviewed by the City thus necessitating less time by <br /> staff in reviewing the document. EKI has assumed that we will provide an electronic PDF copy <br /> of the Draft UWMP for the Cit�/s review. Additional paper copies can be provided if desired <br /> and included in the final scope of work for the Project. <br /> Preparation and Filina of Fina!UWMP <br /> Once the City has consolidated all comments from reviewers, EKI will meet to discuss the <br /> comments received for incorporation into the Final UWMP. EKI will also incorporate comments <br /> Page �22 <br /> Redwood City Publlc Works Services Department 2015 UWMP � (EKI 85-078) <br /> ATTY/AGR.2015.248/EKI - Development of 2015 Urban Water Management Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.