My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt15 V&A Consulting Engineers, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2015
>
Agmt15 Under 60K
>
Agmt15 V&A Consulting Engineers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2015 9:55:33 AM
Creation date
12/10/2015 9:55:32 AM
Metadata
Fields
Template:
Agreement
Contractor Name
V&A Consulting Engineers, Inc.
PROJECT NAME
Snaitary Sewer Flow monitoring services at 32 sites
RMP File Number
304.5
Date
12/9/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Consultant shall be paid per percentage of work accomplished at the end of the <br /> month. � <br /> A. Direct Labor Costs <br /> Field Reconnaissance / Document Review/Wet Weather Flow <br /> Monitoring / Data Analysis and Flow Monitoring Report-------------$34.269.00 <br /> Subtotal (Direct Labor Costs) $34,269.00 <br /> B. Other Direct Costs <br /> CSE Truck & Equipment --------------------------------------------------$1,300.00 <br /> Mileage -------------------------------------------------------------------------$460.00 <br /> Open Channel Flow Meters ----------__________________________________�12,600.00 <br /> Lift Station Loggers ---------------------------------------------------------$4,800.00 <br /> Closed Pipe Flow Meter---------------------------------------------------$1,600.00 <br /> RainGauges ---------------------------------------------------------------$400.00 <br /> Batteries ----------------------------------------------------------------------$456.00 <br /> Field Materials ----------------------------------------------------------$65.00 <br /> Office Expenses ------------------------------------------------------------- 55.00 <br /> Subtotal (Other Direct Costs) $21,731.00 <br /> Total Fixed Cost $56,000.00 <br /> C. Optional Costs (not part of Direct Costs) <br /> Weekly extensions of flow meters and rain gauge, if required, <br /> shall be provided by the consultant for the additional amount <br /> of$1,000.00 per week for four(4)weeks ------------------------------ $4,000.00 <br /> Total contract amount (including additional one month period <br /> of flow monitoring in addition to the 60 days specified if required.) ----------- $60,000.00 <br /> REV:11-23-15 VR <br /> Page 12 of 14 <br /> ATTY/AGR.2015.258N&A Consulting Engineers, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.