My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt15 V&A Consulting Engineers, Inc (2).
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2015
>
Agmt15 Under 60K
>
Agmt15 V&A Consulting Engineers, Inc (2).
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2015 9:55:34 AM
Creation date
12/10/2015 9:55:33 AM
Metadata
Fields
Template:
Agreement
Contractor Name
V&A Consulting Engineers, Inc.
PROJECT NAME
Snaitary Sewer Flow monitoring services at 11 sites
RMP File Number
304.5
Date
12/9/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Subtotal (Direct Labor Costs) $30,901.00 <br /> B. Other Direct Costs <br /> CSE Truck& Equipment------------------------------------------------------------------$1,040.00 <br /> Mileage----------------------------------------------------------------------------------------$368.00 <br /> FlowMeters---------------------------------------------------------------------------------$18,700.00 <br /> RainGauges-------------------------------------------------------------------------------------$400.00 <br /> Batteries-----------------------------------------------------------------------------------------$528.00 <br /> FieldMaterials---------------------------------------------------------------------------------- $41.00 <br /> OfficeExpenses---------------------------------------------------------------------------- 22.00 <br /> Subtotal (Other Direct Costs) $21,099.00 <br /> Total fixed cost $52,000.00 <br /> C. Optional Costs (not part of fixed cost) <br /> Weekly extensions of flow meters and rain gauge, if required, <br /> shall be provided by consultant for the additional amount <br /> of$2,000.00 per week for four(4)weeks---------------------------------------------- g 000.00 <br /> Total contract amount(including additional one month period <br /> of flow monitoring in addition to the 60 days specified if required.)------------------------$60,000.00 <br /> REV:11-16-15 VR <br /> Page 11 of 11 <br /> ATTY/AGR.2015.250/V&A Consulting Engineers Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.