My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt15 V&A Consulting Engineers, Inc (2).
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2015
>
Agmt15 Under 60K
>
Agmt15 V&A Consulting Engineers, Inc (2).
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2015 9:55:34 AM
Creation date
12/10/2015 9:55:33 AM
Metadata
Fields
Template:
Agreement
Contractor Name
V&A Consulting Engineers, Inc.
PROJECT NAME
Snaitary Sewer Flow monitoring services at 11 sites
RMP File Number
304.5
Date
12/9/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(considered preliminary) will be provided to the City for review on a weekly basis within <br /> three (3) days after interrogation. At the City's discretion, the data submittals may be <br /> reduced to a biweekly basis after the first two (2) weeks if the initial data appears to be <br /> good. The final data shall be compiled following removal of the flow meters and the <br /> rain gauge. In the event that more than one flow meter fails to provide usable data <br /> during a significant storm event (> 0.5 inches of rainfall in 24 hours), Consultant shall <br /> extend the monitoring period for up to two (2)weeks at no additional cost to the City. <br /> Deliverable: <br /> Consultant shall provide the City with a Flow Monitoring Report (3 copies) containing <br /> site details and pictures; field installation and maintenance sheets including calibration <br /> data; depth-velocity scatter plots; 7-day plots of flow for each meter and rainfall for <br /> each rain gauge; and summary tabulation of daily average, minimum, and peak flow <br /> for each flow meter. Electronic files shall be submitted in Excel format containing <br /> depth, velocity, and flow rates for each meter and rainfall for each rain gauge in 15- <br /> minute intervals. Final report and data shall be delivered within three (3) weeks of <br /> completion of flow monitoring. <br /> Consultant shall perform all the work in the best workmanlike manner, conforming to all <br /> applicable standards, specifications, codes, laws, and regulations. Consultant shall take all <br /> necessary safety precautions and comply with all applicable Federal, State, and local <br /> regulations including those relevant to work in confined spaces. Consultant shall comply with all <br /> applicable traffic control requirements including those of the City or agency with jurisdiction over <br /> the meter sites. <br /> TIME SCHEDULE <br /> Consultant shall meet the scheduling requirements as described in the Scope of Work and the <br /> scheduling milestones as follow: <br /> Site Reconnaissance of inetering sites: November 13, 2015 <br /> Documentation of Field Reconnaissance: November 20, 2015 <br /> Approval of Sites by City(if changes are required): November 26, 2015 <br /> Meters and rain gauge installed and operating: December 4, 2015 <br /> First data batch reported to City: December 18, 2015 <br /> Meters Removed: February 5, 2016 <br /> Final Report: February 26, 2016 <br /> The removal of the flow meters and the submission of the final report may be delayed if the City <br /> extend the flow monitoring period. <br /> FEE SCHEDULE <br /> City shall pay the consultant the following amount to install eleven (11)flow monitoring meters and <br /> one (1) rain gauge for 60 days period and an option to extend the flow monitoring period to up to <br /> one month as follows: <br /> The Consultant shall be paid per percentage of work accomplished at the end of the month. <br /> A. Direct Labor Costs <br /> Field Reconnaissance/ Document Review/Wet Weather Flow <br /> Monitoring / Data Analysis and Flow Monitoring Report------------------------- 30 901.00 <br /> REV:11-16-15 VR <br /> Page 30 of 11 <br /> ATTY/AGR.2015.250N&A Consulting Engineers Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.