My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt15 Macleod and Associates, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2015
>
Agmt15 Under 60K
>
Agmt15 Macleod and Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2015 10:17:53 AM
Creation date
12/10/2015 10:17:52 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Macleod and Associates, Inc.
PROJECT NAME
Topographic Survey maps for design phase of sanitary sewer replacement project
RMP File Number
304
Date
12/9/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT SCHEDULE: <br /> Consultant shall complete the work within ninety (90) calendar days after receiving <br /> written authorization from the City Engineer, the Notice to Proceed (NTP). <br /> DELIVERABLES: <br /> Within ninety (90) calendar days after receiving written authorization from the City <br /> Engineer, the Notice to Proceed (NTP), Consultant shall deliver to the City the following: <br /> 1. Electronic files of completed topographic survey base maps for sanitary <br /> sewer Basin 6 in AutoCAD delivered into three (3) sequential phases: <br /> a. Phase 1 — Hampton Avenue and Connecticut Drive <br /> b. Phase 2 — Anamor Street, Virginia Avenue, Sierra Street (2), Kentfield <br /> Avenue-B <br /> c. Phase 3 — Kentfield Avenue-A, Union Avenue, Regent Street, Oxford <br /> Street (2), Woodside Road (3) <br /> 2. Two sets of hard copies. <br /> SURVEY PROJECT AREA MAPS: <br /> Consultant shall refer to attached project area maps and the street tabulation with <br /> boundaries as shown in the Request for Proposal for reference. Consultant shall survey <br /> approximately 10,974 linear feet of sewer pipeline which includes the additional extent <br /> of survey beyond the end of manholes and street intersections. <br /> REV:11-17-15 VR <br /> Page 11 of 14 <br /> ATTY/AGR.2015.254/MacLeod &Associates- Civil Engineering and Land Surveying <br />
The URL can be used to link to this page
Your browser does not support the video tag.