My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 CDM Smith Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Agmt16 CDM Smith Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2018 4:07:54 PM
Creation date
2/2/2016 1:00:42 PM
Metadata
Fields
Template:
Agreement
Contractor Name
CDM Smith Inc.
PROJECT NAME
Downtown Transit Center and Broadway Streetcar Study
RMP File Number
304
Date
1/29/2016
MO Ref
16-009, 18-146
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
the technical memoranda, as prepared for each task. The Consultant will also prepare a <br /> project presentation and we will be available to attend meetings of the Planning <br /> Commission and City Council. <br /> Deliverables: Draft and final project summary reports, technical appendices, and project <br /> presentation <br /> PHASE 2 - STATION AREA IMPROVEMENTS FOR THE DOWNTOWN TRANSIT <br /> CENTER: <br /> Task 2.1 - Prepare an Existing Conditions Analysis of the Downtown Transit <br /> Center <br /> The Consultant will prepare a consolidated data request list for both projects and will <br /> review the list with City staff. The Consultant will conduct an on-site inventory and <br /> assessment of current operating conditions and amenities. These will include all <br /> features of the station site such as passenger shelters, benches, light fixtures, transit <br /> information displays, pay and emergency phones, fare equipment and parking revenue <br /> equipment, parking spaces by type, bus bays and areas for taxis, shuttles, etc., and <br /> bicycle parking provisions by type. A walking tour of the station with City, Caltrain, and <br /> SamTrans staff is also proposed as a means of gathering more information as to how <br /> the station currently functions and discussing possible improvements. <br /> Deliverables: Data needs list, existing conditions evaluation memorandum <br /> Task 2.2 - Planning for Station Amenities <br /> It will be important to work with the project team including SamTrans and Caltrain to <br /> identify those amenities that should be included as part of the station development plan. <br /> Based on the collaboration and site review with the City and the transit providers, a <br /> listing and plan for future enhancement of station amenities would be prepared. Urban <br /> design guidance will be provided as to how best of incorporate the desired amenities <br /> and achieve the guiding principles as defined by the team. <br /> Deliverables: Stafion amenities memorandum <br /> Task 2.3 — Downtown Transit Center Connection Improvements <br /> The Consultant will work together to formulate two to three alternative site plan <br /> concepts for the transit center and surrounding area. These concepts may include <br /> phases to address the steps involved in the implementation of the blended Caltrain/HSR <br /> program and the streetcar/urban circulator. The concepts will then be reviewed and <br /> evaluated in terms of their ability to meet the guiding principles identified in Task 2.2. <br /> The evaluation will include transit connectivity, transit capacity, cost estimates, potential <br /> benefits, consistency with current plans such as the Downtown Precise Plan, impacts <br /> on adjacent land uses, traffic circulation, pedestrian and bicycle service quality and <br /> safety, and visual attributes. Other considerations will be operating costs, ADA <br /> requirements, and funding. <br /> The Consultant will coordinate a meeting with the City, SamTrans, and Caltrain to <br /> review and critique the concepts. Site plans and sketches will be provided to help <br /> visualize each concept. Functional diagrams will indicate the flows of <br /> pedestrians/bicyclists, transit vehicles, private passenger cars, taxis, and shuttles. <br /> REV:01-06-16 VR <br /> Page 14 of 17 <br /> ATTY/AGR2016.003/CDM Smith - Streetcar and Downtown Transit Center <br />
The URL can be used to link to this page
Your browser does not support the video tag.