My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 Dyett & Bhatia
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Agmt16 Dyett & Bhatia
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2017 10:42:56 AM
Creation date
2/4/2016 10:34:25 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Dyett & Bhatia
PROJECT NAME
El Camino Real Corridor Plan
RMP File Number
304
Date
2/3/2016
MO Ref
16-007, 17-137
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
effort can assist in refining a preferred land use program (and related development <br /> regulations) for the three Corridor segments. <br /> 4-E Infrastructure Financing Capacity and Strategy (Sub-Consultant-1). A <br /> range of public improvements will be identified as part of the Corridor Plan, mainly <br /> focusing on transpo�tation improvements for pedestrians, bicycles, and transit; <br /> improved vehicle parking access; and streetscape improvements. This task will <br /> assemble these costs (as estimated by others or as previously developed by City <br /> staff) and evaluate funding options for paying for these improvements. <br /> Funding options wilf include incorporation of the costs in the City's existing <br /> development impact fee programs, creation of Corridor-specific funding sources <br /> such as assessment districts or a special tax district, and use of grant funding from <br /> regional or State sources (e.g., ABAG grants, CMA County sales tax funding, or <br /> other grant sources). The feasibility analysis conducted in Task 4-D will help <br /> establish estimated funding capacity from the development-based funding sources. <br /> Task 5: Development Standards and Street Design Options <br /> C?bjective: lncorporating the resu/ts af Tasks 1 through 4, draft development standards, <br /> land use policies, and design guidelines options to improve and enhance fhe Corridor. <br /> The work will help to integrate land use and fransportation policies, promoting Corridor <br /> and Downtown Precise P/an goa/s re/ated to pedestrian- and transit-oriented devel- <br /> opment, and complete sfreets consistent with the EI Camino Rea!'s "Grand Bou/evard" <br /> designation. lt will be accompanied by map graphics, schematic design-leve/plans, and <br /> illustrations of prototypica/conditions and special opportunity areas. <br /> 5-A Establish �and Use Policy and Regulatory Objectives (Consultant). <br /> Informed by the results of previous Tasks, land use policies and regulatory <br /> objectives will be prepared in a repart with accompanying maps and i(lustrations, <br /> including land use designations, permitted use mixes, development intensities, <br /> development potential (market-rate and affordable housing units), and building <br /> square footage. Conceptual Urban Design and Streetscape Options (Sub- <br /> Consultant-2j. <br /> 5-B Preliminary Draft Development Standards (Consultant). Findings from <br /> economic and market anaMyses will be considered in drafting standards to regulate <br /> the design and use of development in the Corridor. The requirements will be <br /> crafted to implement proposed policies and provide a basis for a defined benefits <br /> program that reflects community priorities. <br /> 5-C Conceptual Urban Design and Streetscape Options (Consultant). Map <br /> graphics, schematic design-level plans, and illustrations of prototypical conditions <br /> and special opportunity areas will be provided to cfarify expectations for future <br /> development and streetscape improvement projects. <br /> • Streetscape lmprovements Plan — Symbols and annotations will be used to <br /> indicate location and type of recommended sidewalk/frantage, median, <br /> intersection/crossing, and transit improvements. Sketches of prototypical <br /> streetscape guidelines conditions will be keyed to map; see below. <br /> REV:08-12-15 VR <br /> Page 17 of 21 <br /> RTTY/AGR.2015.1641Professional Services Agreement with Qyett& Bhatia <br />
The URL can be used to link to this page
Your browser does not support the video tag.