My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 Dyett & Bhatia
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Agmt16 Dyett & Bhatia
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2017 10:42:56 AM
Creation date
2/4/2016 10:34:25 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Dyett & Bhatia
PROJECT NAME
El Camino Real Corridor Plan
RMP File Number
304
Date
2/3/2016
MO Ref
16-007, 17-137
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Prototype Urban Design/Streetscape Guidelines Sketches — Prepare up to <br /> five annotated 3D sketches illustrating recommended building form(s) and <br /> frontage and streetscape improvements, based on the subarea guidelines <br /> and streetscape plans prepared per a) and b) above. The sketches will <br /> depict key elements needed to configure new development and streetscape <br /> to achieve a Grand Boulevard Corridor character per the General Pian. <br /> • Opportunity Site/Special Condifion lllustrations — Up to two additiona[ <br /> sketches ar diagrams will be prepared to illustrate recommendations for <br /> special development opportunity sites, freeway gateway locations, or other <br /> conditions. <br /> • Streetscape Improvements/Policies Outline — Prepare a bullet list/outline of <br /> recommended capital improvements; indicate which could be provided as <br /> part of frontage improvements by private development and which would be <br /> public projects. Provide concept-level cost estimates based on rule-of- <br /> thumb comparables. <br /> Task 6: Prepare Draft Corridor Plan <br /> Objective: Building on work in previous tasks, complete the p/an components, inc/uding <br /> speci�c changes to the existing zoning for the Corridor. Develop and revise the Draft <br /> Corridor P/an. <br /> 6-A Complete Technical Elements of the Plan {Consultant, team <br /> contributions). The following elements af the EI Camino Corridor Plan will be <br /> prepared as the technical work described in the foregoing tasks is completed. <br /> • Definition of the EI Camino Corridor (Sub-areas), etc. <br /> • Integration with the General Plan, Downtown Precise Plan, and Existing <br /> Zoning Districts <br /> • Caordination with Other City Plans and Impravements <br /> • Affordable Housing and Community Benefits Opportunities <br /> • Analysis of Financing Capacity and Funding Options <br /> • Implementation and Administrative Framework <br /> 6-B Prepare and Re�iew Administrative Draft Plan {Consultant, team <br /> contributions}. The EI Camino Real Gorridor Plan should be a concise, graphics- <br /> oriented document. <br /> • Background, /ssues, and Goals — Text describing plan area streetscape <br /> conditions, utility canditions/constraints, community input, and streetscape <br /> REV:0$-12-15 VR <br /> Page 18 of 21 <br /> ATTYlAGR.2015.1641Professional Services Agreement with Dyett& Bhatia <br />
The URL can be used to link to this page
Your browser does not support the video tag.