Laserfiche WebLink
Funds for the 2015-2016 Sanitary Sewer Replacement Project were previously <br />approved and appropriated in Fiscal Year 2015-16 budget as Sewer Fund Capital <br />Projects – Collection System Replacement Program. There is an available balance of <br />$5,980,456.70 as of February 5, 2016. <br /> <br />ENVIRONMENTAL REVIEW <br />As the lead agency, City of Redwood City determined that the 2015-2016 Sanitary <br />Sewer Replacement Project meets the California Environmental Quality Act (CEQA) <br />exemption criteria as set forth in CEQA Guidelines Section 15302, (“Replacement or <br />Reconstruction”) of the CEQA regulations. Furthermore, this project was designed <br />compliant with the City’s Engineering Standards and accepted practices. <br />This project does not require a National Pollutant Discharge Elimination System <br />(NPDES) General Permit for stormwater discharges associated with construction and <br />land disturbance activities pursuant to Attachment A.2 of Order No. R2-2015-0049, <br />NPDES Permit No. CAS612008, which exempts projects to update existing lines and <br />facilities. However, the proposed construction will employ stormwater pollution <br />prevention best methods and practices. <br /> <br /> <br />JEFFREY CHOU <br />ASSISTANT ENGINEER II <br /> <br />AARON AKNIN <br />COMMUNITY DEVELOPMENT DIRECTOR <br /> <br />MELISSA STEVENSON DIAZ <br />CITY MANAGER <br /> <br />ATTACHMENTS <br />Project Location Map <br /> <br />RELATED DOCUMENTS IN CITY CLERK’S OFFICE <br />Drawings and Contract Documents <br />6.1.A. - Page 3