Laserfiche WebLink
EXHIBIT "A" <br /> SCOPE OF SERVICES <br /> itemized List of what Consultant will do for City and at what price and schedule. <br /> A. PROJECT DESCRIPTION <br /> The City of Redwood City {City) has requested a proposal fo�the renovation of the three <br /> pairs of existing tennis courts located at Dolphin, Mariin and Shorebird Parks. The <br /> design will include reconstruction of the existing courts at Dolphin Park, an asphalt <br /> ove�lay at Shorebirc! Park, and just an acrylic resurfacing at Marlin Park. Dolphin Park <br /> will be the only site anticipated to receive new fencing, and all three sites will receive <br /> new court nets and support posts. <br /> As the woric at each site is less than an acre, no SWPPP documentation with State of <br /> California is necessary, C.3 documentation is not included for polphin and Shorebird <br /> Parks as the limit of work is not to e�ctend beyond the court areas, and no biotreatment <br /> areas will be included in the project. Improvements are limited to the immediate tennis <br /> court areas, and do not include any electrical o� stn�ctural enginee�ng services at this <br /> time (with the exception of the new court lighting at Dolphin Park). <br /> Inciuded in the scope are topographic surveying and geotechnical investigative services <br /> for the immediate tennis court area at Dolphin Park only. Surveying work will be based <br /> on an assumed elevation datum (i.e. not tied to a specific City benchmark). Also <br /> included in the scope is the assessment of the court lighting system at Dolphin Paric, as <br /> well as recommendations and design for a new court lighting system, including the <br /> foundation design. Pole and fixture design will be provided by lighting manufacturer. <br /> Electrical design assumes existing power at Dolphin Park is adequate and no service <br /> upgrade is necessary. <br /> B. SCOPE OF SERVICES <br /> Verde Design wi8 provide the following detailed scope of work based on the above stated <br /> project description: <br /> Task 1: Project Start-up/Site Assessment <br /> 1. Attend one kick-off meeting with City to discuss project, including budget, <br /> timeline and parameters. <br /> a. Receive relevant documents from the City for all sites including as-built <br /> drawings and specification as well as any other information that will assist <br /> in the assessment of the facilities. <br /> b. Review the scope of work with the City. <br /> REV:03-0$-16 VR <br /> Page i0 of 15 <br /> ATTY/AGR.2016.041Nerde Design, Inc. -RWS Tennis Court Resurfacing <br />