My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 Verde Design, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Under 60K
>
Agmt16 Verde Design, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2016 10:30:39 AM
Creation date
3/30/2016 10:30:34 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Verde Design, Inc.
PROJECT NAME
Proposal for Renovation of 3 tennis Courts at Dolphin, Marlin and Shorebird parks
RMP File Number
304.5
Date
3/30/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
c. Visit each of the three project sites and walk the project area to confirm <br /> the existing conditions. <br /> d. Agenda and minutes of the meeting will be provided by Verde Design <br /> 2. Complete suniey and geotechnical investigative work at Dolphin Paric <br /> 3. Prrepare an assessment report to include existing conditions evaluation, findings <br /> and recommendations, include ROM construction costs. <br /> 4. Attend a meeting with City staff to present and discuss assessment report for the <br /> three project sites. <br /> Task 2: Ini#ial Design (65% Design Submittal) <br /> 1. Upon receiving direction from the City to proceed with the identified <br /> improvemen#s and construction budget, Verde Design will develop this this initial <br /> design witl be useti as the basis for the development of the Final Design. The <br /> tasks inciude, but not limited to the following: <br /> 2. Set up CAD background files and applicable drawing sheets. <br /> 3. Develop a 65% CD submittal package (three sets to be provided). The package <br /> will include the following at a minimum: <br /> a. Cover sheet <br /> b. Existing conditions plans <br /> c. Demolition plans <br /> d. Grading/ Drainage plans <br /> e. Layout/material plans <br /> f. Construction details <br /> g. Technical Specifications <br /> h. Statement of Probable Construction Costs <br /> 4. Internal Redline/QC �eview by Verde staff. <br /> 5. Attend one meeting with City staff to present and review 65°!o package. <br /> Task 3: Final Design {95°!o Design Submittal) <br /> 1. Develop a 95% PS8�E submittal package (three sets to be provided) based on <br /> #he comme�ts received comments on the 65% submittal package. <br /> 2. intemai RedlinelQC review by Verde staff. <br /> 3. Attend one meeting with City staff to present and review 95°lo package. <br /> Task 4: Bid Package (100°10 Design Submittal� <br /> 1. Incorporate comments received from the City on the 95% Design Submittal. <br /> 2. Prepare the 100°lo Design Submittal including complete construction <br /> documents, spec�cations and cost estimates. <br /> 3. Intemal Rediine/QC review by Verde staff. <br /> 4. The 100% Design Submittal shall be ready for signature and one set will be <br /> submitted to the City for review and approval. A marlced set will be returned <br /> along with staff's comments and/or clarifications for revision. <br /> 5. Provide one set of full size plans and specifications for the project including <br /> the responsible engineer's wet stamp and signature with a license expiration <br /> date. <br /> REV;03-08-i6 VR <br /> Page 11 of 15 <br /> ATTY/AGR.2016.041Nertie De,sign, Inc.-RWS Tennis Court ResurFacing <br />
The URL can be used to link to this page
Your browser does not support the video tag.