My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 Verde Design, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Under 60K
>
Agmt16 Verde Design, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2016 10:30:39 AM
Creation date
3/30/2016 10:30:34 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Verde Design, Inc.
PROJECT NAME
Proposal for Renovation of 3 tennis Courts at Dolphin, Marlin and Shorebird parks
RMP File Number
304.5
Date
3/30/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6. Provide an electronic copy of the drawings in AutoCAD as required and in <br /> PDF Format, specifications in Word and PDF format, and a cost estimate in <br /> Excel and PDF format. <br /> Task 5: Bid Suppo�t and Construction Services: The following seniices will be <br /> provided during the bidding process and construction phase of the project. <br /> 1. Contact potential bidders <br /> 2. Provide design clarification responses du�ing the bid phase via addenda. <br /> 3. Provide signed confoRned contract document set incorporating addenda <br /> issued during the bid process and other changes subsequent to the 100% <br /> Design Submittal. <br /> 4. Attend, participate and review the project at the Pre-Construction Meeting. <br /> 5. Attend four (4) construction meetings, including site visits, at regular intervals <br /> during active construction progress of the work. City construction manager <br /> will handle meeting documentation. <br /> 6. Review shop drawings submittals, change order requests (COR), requests for <br /> information (RFI), and written recommendations to the City. <br /> 7. Substitution request evaluation. <br /> 8. Participate in the final inspection and assist with the punch list of deficiencies. <br /> C. PROJECT TIMELINE <br /> Verde Design estimates the following general timeline for design: <br /> Project Start-up ISite Assessment:To be oompleted within two weeks of receiving <br /> survey and geotechnical investigative report <br /> Initial Design: Four Weeks <br /> Final Design: Three Weeks <br /> Bid Padcage: Two Weeks <br /> Note: the above timelines does not include any required review time by City staff. <br /> D. CITY RESPONSIBILITIES <br /> In order to complete the items described in Scope of Services above, the City may <br /> provide the following information: <br /> 1. Tennis facility programmatic needs <br /> 2. Any reoord drawings showing underground utilities that may serve anticipated <br /> improvements. These may include drainage, electrical, utilities, imgation, etc. <br /> 3. City c�odes, orclinances, and policies, as well as maintenance practice <br /> guidelines. <br /> 4. Utility survey of existing utilities as needed and/or potholing as required in <br /> specific areas as requested by our office. <br /> 5. Drawing title block and drawing standards. <br /> E. SPECIAL PROVISIONS <br /> Without attempting to be all-inclusive and for purposes of clarity, the following items are <br /> specifically not included in the Scope of Services: <br /> REV:03-08-161/R <br /> Page 12 of 15 <br /> AT�Y/AGR.2016.04iNende Design, Inc.-RWS Tennis Court ResurFacing <br />
The URL can be used to link to this page
Your browser does not support the video tag.