Laserfiche WebLink
<br />ATTY/AGR/2016.063/SSA LANDSCAPE ARCHITECTS <br />REV: 03-29-16 FF <br />Page 14 of 16 <br />e. Perform (1) pre‐final acceptance walk‐through and prepare punchlist, if necessary. <br />Provide recommendation on determination of substantial completion. <br />f. Evaluate change orders prepared by the CITY. <br />g. Conduct (1) final verification walk‐through and provide written report of conditions or any <br />warranty work that may be necessary. <br />h. Prepare CAD record drawings based on Contractor furnished as‐built plans and <br />construction phase drawings, direction, and clarifications. <br /> <br />Task Six Deliverables <br /> <br />1. Record Drawings (CAD) <br />2. (12) CITY meetings, with minutes where noted above: <br /> (1) pre‐construction meeting <br /> (9) construction meetings <br /> (1) pre‐final acceptance walk‐through <br /> (1) final verification walk‐through <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />6.1.D. - Page 17