My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 SSA Landscape Architects
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Agmt16 SSA Landscape Architects
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2019 10:20:52 AM
Creation date
4/18/2016 12:34:51 PM
Metadata
Fields
Template:
Agreement
Contractor Name
SSA Landscape Architects
PROJECT NAME
Red Morton Westside Renovation Project Landscape Architecture seervices
RMP File Number
304
Date
4/13/2016
MO Ref
16-059, 17-162, 18-032, 19-077
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
e. PerForm (1) pre-final acceptance walk-through and prepare punchlist, if necessary. <br /> Provide recommendation on determination of substantial completion. <br /> f. Evaluate change orders prepared by the CITY. <br /> g. Conduct (1)final verification walk-through and provide written report of conditions or any <br /> warranty work that may be necessary. <br /> h. Prepare CAD record drawings based on Contractor furnished as-built plans and <br /> construction phase drawings, direction, and clarifications. <br /> Task Six Deliverables <br /> 1. Record Drawings (CAD) <br /> 2. (12) CITY meetings, with minutes where noted above: <br /> ■ (1) pre-construction meeting <br /> ■ (9)construction meetings <br /> • (1) pre-final acceptance walk-through <br /> ■ (1)final verification walk-through <br /> ATTY/AGR/2016.063/SSA LANDSCAPE ARCHITECTS <br /> REV:03-29-16 FF <br /> Page 14 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.