Laserfiche WebLink
xxii. Expansion of bleacher project as part of the Accessibility ramps for <br />the playground and tree pod access bridges <br />xxiii. Addition of Shade Elements and Structures <br />b. Additional Improvements to the Armory Parking Lot and Entry <br />c. Relocation of PG&E transformer coordination and engineering <br />d. Evaluation of condition and geotechnical recommendations for <br />underground culvert through project site <br />e. Redesign of entry form the Roosevelt Parking Lot <br />f. Weekly design team meetings through completion of 65% Design <br />Development Documents <br />g. Additional coordination with City, Magical Bridge Foundation and Artist <br />Barbara Butler through phone conferences, GoToMeetings and in person <br />meetings to collaborate on design refinements. <br />h. Additional Construction Documentation and Specifications related to the <br />Magical Bridge elements listed above. <br />2. Additional Fees <br />SSA Landscape Architects <br />Additional Pre -Design, Conceptual Planning& Design Development <br />$114,221.00 <br />Additional Design Development $41,900.00 <br />Additional Construction Documents $91,909.00 <br />Additional Sub -Consultant Costs <br />Additional Structural and Civil Engineering <br />Additional Electrical Engineering <br />Geotechnical Engineering <br />TOTAL ADDITIONAL FEES <br />REV: 08-08-17 RL <br />Page 4 of 4 <br />ATTY/AGR.Amend No. 1 /SSA Landscape <br />$77,000.00 <br />$8,800.00 <br />$7,700.00 <br />$341,530.00 <br />