My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-04-25 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-04-25 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2016 10:48:55 AM
Creation date
4/22/2016 3:39:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/25/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
596
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.1.A. - Page 6 <br /> i. Review the Consultant's comprehensive schedule that establishes a base line <br /> and reports the status and progress of the project. The schedule should include <br /> details such as milestones and key activities to track project progress. Review <br /> the Consultant's three week look-ahead schedule. Verify that schedules <br /> conform to the construction contract documents. <br /> j. Work with CITY and Consultant to maintain use of existing facilities that are <br /> affected by the construction, to minimize the disruption to the existing facilities <br /> and to have their continued use during the construction of the project. This <br /> includes all phase of construction and delivery of materials. <br /> REV:03-23-16 FF <br /> Page 4 of 4 <br /> ATTY/AGR.Amend No.2/Gilbane Building Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.