My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-04-25 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-04-25 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2016 10:48:55 AM
Creation date
4/22/2016 3:39:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/25/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
596
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 Project L7.B. - Page 35 <br /> The order of work and estimated durations for the construction tasks for the storm drain pump <br /> station are as listed as follows: <br /> • Mobilization: 3 days <br /> • Clearing and grubbing: 5 days <br /> • Installation of best management practices (BMPs): 5 days <br /> • Installation of shoring system for wet well construction: 10 days <br /> • Installation of wet well and pumps: 40 days <br /> • Installation of valve vault, equipment, and communication facilities: 30 days <br /> • Installation of drainage pipes: 10 days <br /> • Demolition and removal of existing pump station: 5 days <br /> • Construction of maintenance driveway: 5 days <br /> • Restoration of site: 5 days <br /> The order of work and estimated durations for the construction tasks for the US 101 undercrossing <br /> are below: <br /> • Mobilization: 5 days <br /> • Clearing and grubbing: 5 days <br /> • Installation of BMPs: 5 days <br /> • Installation of temporary cofferdam: 10 days <br /> • Excavation for wall work under US 101: 10 days <br /> • Installation of tie backs/shotcrete: 20 days <br /> • Preparation and construction of bottom slab for path: 15 days <br /> • Construction of creek-side retaining wall: 10 days <br /> • Construction of second face of tieback wall: 10 days <br /> • Construction of retaining walls and sidewalks beyond path under US 101: 20 days <br /> • Installation of railing,lighting, call boxes,and miscellaneous path items: 10 days <br /> • Construction of sidewalk, street trees,and pedestrian lights in City-owned parcel: <br /> 15 days <br /> • Construction of scenic overlook: 5 days <br /> • Landscaping: 5 days <br /> • Site restoration: 5 days <br /> 1.5.4 Construction Equipment <br /> Table 1-1 shows the equipment needed for the construction of the proposed project. Construction <br /> of the storm drain pump station would require the following equipment: <br /> 1-9 US 101 Pedestrian Undercrossing and <br /> Bair Island Storm Drain Pump Station Project <br />