My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-04-25 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-04-25 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2016 10:48:55 AM
Creation date
4/22/2016 3:39:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/25/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
596
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.B. - Page 36 1 Project Description <br /> Table 1 <br /> PROPOSED PROJECT CONSTRUCTION EQUIPMENT <br /> Storm Drain Pump Station Joint-Use Path <br /> Sheet pile driver/crane 110-hp crane <br /> 135-hp track-mounted excavator 335-hp dozer <br /> 335-hp dozer 90-hp backhoe <br /> 90-hp backhoe 75-hp skid steer loader <br /> 250-hp delivery truck 250-hp delivery truck <br /> 400-hp, 12-cubic yard dump truck 400-hp, 12-cubic yard dump truck <br /> 100-hp forklift 100-hp forklift <br /> 50-hp concrete pump truck 50-hp concrete pump truck <br /> 50-hp paver 20-hp portable tieback drilling machine <br /> 24-hp generator 10-hp grout mixing machine <br /> 1-hp portable sump pump 10-hp shotcrete machine <br /> 1-hp portable sump pump <br /> 24-hp generator <br /> 1-10 US 101 Pedestrian Undercrossing and <br /> Bair Island Storm Drain Pump Station Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.