Laserfiche WebLink
1 Project 7.B. - Page 37 <br /> 1.6 OTHER AGENCIES WHOSE APPROVAL IS REQUIRED <br /> In addition to the City,the US 101 Pedestrian Undercrossing and Bair Island Storm Drain Pump <br /> Station Project would require approvals from the following agencies: <br /> Agency Approval <br /> Pump Station Facilities <br /> Bay Area Air Quality Management District Authority to Construct for emergency generator <br /> (BAAQMD) <br /> Pedestrian Undercrossing Facilities <br /> California Department of Fish and Wildlife Streambed Alteration Agreement <br /> (CDFW) <br /> California Department of Transportation Encroachment Permit <br /> (Caltrans) <br /> San Francisco Bay Regional Water Quality Section 401 Certification <br /> Control Board (SFRWQCB) <br /> U.S. Army Corps of Engineers (USACE) Section 404 Nationwide Permit (NWP) <br /> The City would apply to the USACE for a NWP 14 (Linear Transportation Projects) for excavation <br /> and installation of the joint-use path facilities below the mean high tide elevation of Redwood Creek <br /> and for a NWP 33 (Temporary Construction,Access,and Dewatering) for the construction activities <br /> including the cofferdam in this area. The USACE would consult with the National Marine Fisheries <br /> Service (NMFS),the State Historic Preservation Office (SHPO), and the US Fish and Wildlife <br /> Service prior to issuing its approval for the project. <br /> In addition, the project would file a Notice of Intention to comply with the California General <br /> Storm Water Construction Permit (Order No. 2012-006-DWQ) and would submit a Storm Water <br /> Pollution Prevention Plan (SWPPP) to the SFRWQCB. <br /> If the contractor decides to truck or discharge dewatering to the publically-owned treatment system, <br /> the City would obtain an agreement or permit from the South Bayside System Authority (SBSA). <br /> 1.7 LIST OF PREPARERS <br /> Redwood City Staff <br /> • Tanisha Werner, Project Engineer <br /> • Michelle Litdefield,Associate Planner <br /> • Grace Le, Senior Civil Engineer <br /> • Jimmy Tan, Senior Civil Engineer <br /> 1-11 US 101 Pedestrian Undercrossing and <br /> Bair Island Storm Drain Pump Station Project <br />