My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-04-25 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-04-25 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2016 10:48:55 AM
Creation date
4/22/2016 3:39:15 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/25/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
596
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.B. - Page 119 <br /> Mitigation Monitoring and Reporting Plan <br /> Responsible Party: City of Redwood City oversight <br /> Mitigation Measure HYD 2: Increased Height of Creek-side Wall <br /> The height of the creek-side wall may require retrofitting if future sea level rise in Redwood Creek <br /> results in frequent flooding of the joint-use path during 5- or 10-year storm events. The City shall <br /> monitor sea level rise and retrofit the creek-side wall when necessary. <br /> Responsible Party: City of Redwood City <br /> NOISE <br /> Mitigation Measure NOI 1: Construction Scheduling <br /> The Contractor shall ensure that noise-generating construction activity is limited to between the <br /> hours of 7:00 AM and 8:00 PM,Monday through Friday, and noise levels generated by construction <br /> are prohibited on Saturdays, Sundays,and holidays (Redwood City Municipal Code Section 24.30). <br /> Responsible Party: City of Redwood City oversight <br /> Mitigation Measure NOI 2: Construction Equipment Mufflers and Maintenance <br /> The Contractor shall equip all internal combustion engine-driven equipment with intake and exhaust <br /> mufflers that are in good condition and designed for the equipment. <br /> Responsible Party: City of Redwood City oversight <br /> Mitigation Measure NOI 3: Quiet Equipment Selection <br /> The Contractor shall use quiet construction equipment,particularly air compressors,wherever <br /> possible. <br /> Responsible Party: City of Redwood City oversight <br /> Mitigation Measure NOI 4: Notification of Pile Driving <br /> The Contractor shall provide advanced written notification of the schedule for project pile driving <br /> activities to homes and businesses on the east side of US 101 within 200 feet of the replacement <br /> pump station site. <br /> Responsible Party: City of Redwood City oversight <br /> Mitigation Measure NOI 5: Noise Disturbance Coordinator <br /> The City shall designate a "noise disturbance coordinator" who would be responsible for responding <br /> to any local complaints about construction noise. The disturbance coordinator would determine the <br /> cause of the noise complaint (e.g., starting too early,bad muffler, etc.) and institute reasonable <br /> measures warranted to correct the problem. The telephone number for the disturbance coordinator <br /> shall be posted in a conspicuous location at the construction site. <br /> Responsible Party: City of Redwood City <br /> July 15,2013 A-8 US 101 Pedestrian Undercrossing and <br /> Bair Island Storm Water Pump Station Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.