Laserfiche WebLink
7.B. - Page 119 <br /> Mitigation Monitoring and Reporting Plan <br /> Responsible Party: City of Redwood City oversight <br /> Mitigation Measure HYD 2: Increased Height of Creek-side Wall <br /> The height of the creek-side wall may require retrofitting if future sea level rise in Redwood Creek <br /> results in frequent flooding of the joint-use path during 5- or 10-year storm events. The City shall <br /> monitor sea level rise and retrofit the creek-side wall when necessary. <br /> Responsible Party: City of Redwood City <br /> NOISE <br /> Mitigation Measure NOI 1: Construction Scheduling <br /> The Contractor shall ensure that noise-generating construction activity is limited to between the <br /> hours of 7:00 AM and 8:00 PM,Monday through Friday, and noise levels generated by construction <br /> are prohibited on Saturdays, Sundays,and holidays (Redwood City Municipal Code Section 24.30). <br /> Responsible Party: City of Redwood City oversight <br /> Mitigation Measure NOI 2: Construction Equipment Mufflers and Maintenance <br /> The Contractor shall equip all internal combustion engine-driven equipment with intake and exhaust <br /> mufflers that are in good condition and designed for the equipment. <br /> Responsible Party: City of Redwood City oversight <br /> Mitigation Measure NOI 3: Quiet Equipment Selection <br /> The Contractor shall use quiet construction equipment,particularly air compressors,wherever <br /> possible. <br /> Responsible Party: City of Redwood City oversight <br /> Mitigation Measure NOI 4: Notification of Pile Driving <br /> The Contractor shall provide advanced written notification of the schedule for project pile driving <br /> activities to homes and businesses on the east side of US 101 within 200 feet of the replacement <br /> pump station site. <br /> Responsible Party: City of Redwood City oversight <br /> Mitigation Measure NOI 5: Noise Disturbance Coordinator <br /> The City shall designate a "noise disturbance coordinator" who would be responsible for responding <br /> to any local complaints about construction noise. The disturbance coordinator would determine the <br /> cause of the noise complaint (e.g., starting too early,bad muffler, etc.) and institute reasonable <br /> measures warranted to correct the problem. The telephone number for the disturbance coordinator <br /> shall be posted in a conspicuous location at the construction site. <br /> Responsible Party: City of Redwood City <br /> July 15,2013 A-8 US 101 Pedestrian Undercrossing and <br /> Bair Island Storm Water Pump Station Project <br />