Laserfiche WebLink
7.B. - Page 120 <br /> Mitigation Monitoring and Reporting Plan <br /> Mitigation Measure NOI 6: Enclosure <br /> The Contractor shall select an available sound attenuation enclosure for the emergency generator <br /> that would reduce noise levels to 71 dBA at 50 feet. <br /> Responsible Party: City of Redwood City oversight <br /> July 15,2013 A-9 US 101 Pedestrian Undercrossing and <br /> Bair Island Storm Water Pump Station Project <br />