Laserfiche WebLink
6.1.C. - Page 14 <br /> CONTRACTOR shall adhere to the most current Manual of Uniform Traffic Control Devices(MUTCD) <br /> as amended by the California Department of Transportations (Ca ltrans) for traffic control. All <br /> CONTRACTOR'S trucks shall have an arrow board and beacons as well as a full set of cones, candle <br /> sticks, and "Men at Work" signs and tripods that shall be used to provide safety for both employees and <br /> the general public. <br /> Confined Spaces <br /> If entry to confined spaces is necessary,the CONTRACTOR shall follow all appropriate local, state,and <br /> federal laws pertaining to confined space entries. Sanitary sewer manholes are considered confined <br /> spaces. Specific attention is directed also to OSHA safety rules, regulations and precautions to be taken <br /> by the Contractor before entering sanitary sewer manholes,and other sanitation structures with respect to <br /> physical and chemical hazards that may be present. <br /> Night Work <br /> If flow and/or traffic are an issue for CONTRACTOR to complete a segment, arrangements will be made <br /> with City to work at night. CONTRACTOR shall provide businesses/residences two (2) working days <br /> prior notice of any potentially disruptive activity. Additional compensation for night work will not be <br /> paid by the City. <br /> DELIVERABLES: <br /> 1. Deliverables shall include CCTV inspection videos, pictures and databases in an external hard drive <br /> as mentioned herein; manhole inspection reports; printed CCTV inspection reports; summary of <br /> CCTV inspection reports in excel format(see details below),color coded sewer basin site maps(see <br /> details below);MPEG-4 format color video. <br /> 2. Submit summary of the CCTV inspection reports in excel format showing the following: inspection <br /> ID, pipe segment reference, date of inspection, street name, upstream manhole no. designation, <br /> downstream manhole no.designation,sewer use,direction of flow,flow control,size of pipe,type of <br /> pipe, shape of pipe, pipe joint length, total pipe length, actual pipe length surveyed , pre-cleaning <br /> method use,weather condition and the overall pipe rating condition of the pipe segments (from MH <br /> to MH)indicating the following ratings 1 -if the pipe is in excellent condition,2 if the pipe is in good <br /> condition,3-if the pipe is in fair condition,4—if the pipe is in poor condition and 5-if the pipe is in <br /> bad condition and needing immediate removal and replacement. <br /> 3. Submit a GIS with color coded sewer basin site map and a physical or PDF map with the segments <br /> color coded by hand showing pipe segments (from manhole to manhole) pipe condition rate <br /> designation in color coding as follows; Pipe segments (from manhole to manhole)with 1 -excellent <br /> pipe rating condition in blue color; pipe segments with 2-good pipe rating condition in green color; <br /> pipe segments with 3 -fair pipe rating condition in orange color,pipe segments with 4 - poor pipe <br /> rating condition in purple color and pipe segments with 5 bad pipe rating condition in red color. <br /> DEADLINE: <br /> CONTRACTOR shall complete all work within one hundred and twenty(120)calendar days of the City's <br /> notice to proceed.CONTRACTOR shall put a third crew on this project if needed.CONTRACTOR shall <br /> average about 3,000 linear feet per day,per crew,which shall allow CONTRACTOR to finish within the <br /> City's timeframe.CONTRACTOR shall provide the City with a detailed work schedule,to include streets <br /> and dates,at City's request. <br /> REV:03-16-16 VR <br /> Page 11 of 12 <br /> ATTY/AGR.2016.052/Professional Pipe Services <br />