Laserfiche WebLink
7.B. - Page 179 <br /> 2 Environmental Analysis <br /> _____ <br /> ,.....7.. ,,. i- <br /> Figure 2-1 Existing view of Redwood Creek, looking east, at the eastern entrance to the <br /> US 101 Undercrossing,near the proposed Bair Island Storm Drain Pump Station location. <br /> r • -0 -r- r ilk <br /> _ F + <br /> F <br /> - i <br /> ' a+ye' <br /> * } % <br /> ` <br /> y i <br /> Figure 2-2 Existing view near Bair Island Road, looking west from near the proposed <br /> Bair Island Storm Drain Pump Station location. <br /> 2-2 US 101 Pedestrian Undercrossing and Bair <br /> Island Road Storm Drain Pump Station Project <br />