Laserfiche WebLink
7.B. - Page 180 <br /> 2 Environmental Analysis <br /> 1 <br /> i III <br /> ! i ' .. ... ''' ... ei- 2.4!ti-.. -LI <br /> Ifret:X' I—. I ' 0.•• 1 :•... . i, 11, ilii i <br /> TT r•�! �. - i <br /> Figure 2-3 Existing views of the project area southwest of US 101,looking north from <br /> Convention Way Bridge. An existing foot trail runs along the bank of the Redwood Creek. <br /> I.AESTHETICS--Would the project: Potentially Less Than Less Than No <br /> Significant Significant Significant Impact <br /> Impact with Impact <br /> Mitigation <br /> a) Have a substantial adverse effect on a ❑ ❑ ® ❑ <br /> scenic vista? <br /> b) Substantially damage scenic resources, ❑ ❑ ❑ El <br /> including,but not limited to, trees,rock <br /> outcroppings,and historic buildings within <br /> a state scenic highway? <br /> c) Substantially degrade the existing visual ❑ ❑ ® ❑ <br /> character or quality of the site and its <br /> surroundings? <br /> d) Create a new source of substantial light ❑ ❑ ® ❑ <br /> or glare which would adversely affect day <br /> or nighttime views in the area? <br /> -? US 101 Pedestrian Undercrossing and Bair <br /> Island Road Storm Drain Pump Station Project <br />