Laserfiche WebLink
49. C3 Requirements - Plans shall be designed to meet C3 requirements of the Municipal <br /> Regional Permit (MRP) NPDES Permit CAS 612008. [SDR][ENGINEERING] <br /> a. Treatment Controls —Treatment controls shall be designed and sized to treat <br /> run-off from the entire project (including all existing, new, and/or replaced <br /> impervious areas) using flow or volume based sizing criteria specified in <br /> Provision C.3.d of the Municipal Regional Stormwater Permit. <br /> i. Applicant shall coordinate installation of stormwater treatment <br /> measures with the municipality and shall arrange to have the City's <br /> designated inspector present at the time of installation. <br /> ii. Applicant shall arrange for final inspection of installed stormwater <br /> treatment measure by the City's designated inspector within 45 days of <br /> installation or project construction completion, whichever comes first. <br /> b. Tree Wells - High flow-rate tree well filter products and/or high flow-rate media <br /> filter products shall be certified by the Technical Assessment Protocol Ecology <br /> (TAPE) of the Washington State Department of Ecology as meeting the TAPE <br /> protocol General Use Level Designation for Basic Treatment. For TAPE <br /> program information and use level designation statements. <br /> c. Low Impact Design (LID) — LID treatment measures to be shown on final <br /> improvement or grading plans shall not differ materially from the LID treatment <br /> measures presented on the project's Downtown Planned Community permit, <br /> approved on , without written approval from the Planning Department. <br /> d. No Dumping — All drain inlets shall be clearly marked with the words "No <br /> Dumping! Flows to Bay," or equivalent using thermoplastic material or a <br /> plaque. <br /> e. Non-LID - Design of non-LID treatment measures shall be consistent with <br /> applicable technical guidance in Chapter 6 of the C.3 Technical Guidance. <br /> f. Use of Copper - Projects with architectural copper should, if possible, <br /> purchase copper materials that have been pre-patinated at the factory. <br /> Whether patination is done offsite or onsite, applicant should consider coating <br /> the copper materials with an impervious coating that prevents further corrosion <br /> and runoff. If patination is done on-site, implement one or more of the <br /> following: <br /> i. Discharge the rinse water to landscaping. Ensure that the rinse water <br /> does not flow to the street or storm drain. Block off storm drain inlet if <br /> needed. <br /> ii. Collect rinse water in a tank and pump to the sanitary sewer. Contact <br /> your local sanitary sewer agency before discharging to the sanitary <br /> sewer. <br /> iii. Collect the rinse water in a tank and haul off-site for proper disposal. <br /> ATTY/RES0.0027/PC RESO 2075 BROADWAY <br /> REV:04-18-16 VR <br /> Page 13 of 28 <br />