Laserfiche WebLink
51. Driveways —Abandoned driveways shall be removed and replaced with sidewalk, curb <br /> & gutter in accordance with City's Engineering Standards pursuant to City Ordinance <br /> Chapter 29, Article III. New driveway approaches in any public right-of-way shall be <br /> constructed in accordance with City of Redwood City Engineering Standards, Volumes <br /> 1, 2 and 3 and in a manner approved by the City Engineer pursuant to City Ordinance <br /> Chapter 29, Article III. [SDR][ENGINEERING] <br /> 52. Driveway Design — At the time of Building Permit submittal, the design shall include: <br /> signage alerting vehicles of pedestrians crossing the sidewalk and an audible system <br /> alerting pedestrians of exiting vehicles. [COA][PLANNING] <br /> 53. Street Design Standards — Street widening, improvements, and dedications shall be <br /> in accordance with the Engineering Standards Volumes 1, 2, and 3 and in a manner <br /> approved by the City Engineer.) [COA][ENGINEERING] <br /> 54. Curb ramps — All new curb ramps shall meet current Caltrans standards for ADA <br /> access. [SDR][ENGINEERING] <br /> 55. Sidewalks — All sidewalks adjacent to the project site shall meet City standards. <br /> Special paving or scoring patterns shall be coordinated with the City's Landscape <br /> Architect. [SDR][ENGINEERING] <br /> 56. Garage ramps - Parking garage ramps shall be designed in conformance with Volume <br /> III of the Engineering Standards, and shall consider safety and visibility of pedestrians <br /> to the satisfaction of the Engineering division. [SDR][ENGINEERING] <br /> 57. Street Infrastructure Restoration — The streets surrounding the project site shall be <br /> restored to the satisfaction of the City Engineer at project completion. When this <br /> requires pavement restoration (such as a slurry seal), the applicant shall consult with <br /> the City Engineer for the preferred layout of pavement markings. <br /> [SDR][ENGINEERING] <br /> 58. Street Infrastructure Reconstruction - The applicant shall replace, repair, repave, or <br /> reconstruct street, curb, gutter and sidewalk pursuant to City Ordinance chapter 18, <br /> article XIV. The project frontage includes a portion of Broadway which experiences <br /> gradual subsidence due to the former location of Redwood Creek. As part of the <br /> project, any areas of subsidence within the project frontage shall be corrected. <br /> Corrective measures could include, but not be limited to, complete street reconstruction <br /> where necessary, and reconstruction of affected storm drain improvements. <br /> [COA][ENGINEERING] <br /> 59. Street Infrastructure Improvements — The applicant shall be responsible for street <br /> and sidewalk improvements beyond the project site frontage along Broadway to the <br /> driveway entrance to the City lot behind. [COA][PLANNING] <br /> ATTY/RES0.0027/PC RESO 2075 BROADWAY <br /> REV:04-18-16 VR <br /> Page 15 of 28 <br />