Laserfiche WebLink
sequencing to the maximum extent practicable to provide for smooth transitions <br /> between adjacent projects during all phases of construction, to reduce impacts to public <br /> access (vehicular and pedestrian) during construction, and to avoid reconstruction of <br /> recently constructed improvements. [SDR][ENGINEERING] <br /> a. The construction activities shall not impact adjoining properties, including <br /> ingress egress operations, without providing adequate planning for fire <br /> protection and life safety. All planning efforts shall be agreed to by the <br /> adjoining property owners and approved by the fire and building departments. <br /> 73. Construction Noise — The applicant shall comply with the following construction- <br /> period noise abatement measures: [SDR][BUILDING] <br /> a. Construction Plan. Prepare a detailed construction plan identifying the <br /> schedule for major noise-generating construction activities. The construction <br /> plan shall identify a procedure for coordination with nearby noise-sensitive <br /> facilities so that construction activities and the event schedule can be <br /> scheduled to minimize noise disturbance. This plan shall be provided to all <br /> noise-sensitive land uses within 500 feet of the construction site. <br /> b. Construction Equipment Mufflers and Maintenance. Equip all internal <br /> combustion engine-driven equipment with intake and exhaust mufflers that are <br /> in good condition and appropriate for the equipment. <br /> c. Equipment Locations. Locate stationary noise-generating equipment required <br /> on construction project sites as far as possible from sensitive receptors when <br /> sensitive receptors adjoin or are near a construction project site. <br /> d. Quiet Equipment Selection. Use quiet construction equipment, particularly air <br /> compressors, wherever feasible. <br /> e. Temporary Barriers. Construct solid plywood fences around construction sites <br /> adjacent to residences, operational businesses, or noise-sensitive land uses. <br /> f. Temporary Noise Blankets. Temporary noise control blanket barriers should <br /> be erected along building facades of construction sites to attenuate noise from <br /> elevated activities if noise conflicts cannot be resolved by scheduling. (Noise <br /> control blanket barriers can be rented and quickly erected.) <br /> g. Noise Disturbance Coordinator. For projects that would last over one year in <br /> duration, the City may choose to require project designation of a "Noise <br /> Disturbance Coordinator" who would be responsible for responding to any <br /> local complaints about construction noise. The Disturbance Coordinator would <br /> determine the cause of the noise complaint (e.g., starting too early, bad <br /> muffler, etc.) and institute reasonable measures to correct the problem. Post in <br /> a conspicuous location a telephone number for the Disturbance Coordinator at <br /> the construction site and include it in the notice sent to neighbors regarding <br /> the construction schedule. (The project sponsor should be responsible for <br /> ATTY/RES0.0027/PC RESO 2075 BROADWAY <br /> REV:04-18-16 VR <br /> Page 18 of 28 <br />