Laserfiche WebLink
77. Stormwater Treatment Measures — Stormwater treatment measures to be shown on <br /> final improvement or grading plans shall not differ materially from the LID treatment <br /> measures presented on the project's Downtown Planned Community permit, approved <br /> on , without written approval from the Engineering Department. <br /> [COA][ENGINEERING]. <br /> 78. No Dumping Flows to the Bay — On-site storm drain inlets shall be clearly marked <br /> with the words "No Dumping! Flows to Bay," or equivalent using thermoplastic material <br /> or a plaque. [SDR][ENGINEERING] <br /> 79. NOI — The applicant shall file a Notice of Intent (NOI) with the State Water Resources <br /> Control Board under the Construction Activities Storm Water General Permit (General <br /> Permit). The NOI indicates the applicant's intent to comply with the San Mateo <br /> Countywide Stormwater Pollution Prevention Program, including a Stormwater <br /> Pollution Prevention Plan (SWPPP). [SDR][ENGINEERING] <br /> 80. Building Materials Specifications — Buried metal infrastructure shall have cathodic <br /> protecting using a sacrificial anode system that conforms to Part VII (G) of the City's <br /> water system design criteria and standard specification details Section 02661. <br /> Additionally, concrete mixes shall conform to Caltrans specifications for Protection of <br /> Reinforcement Against Corrosion Due to Chlorides, Acids, and Sulfates as outlined in <br /> the Memo to Designers 10-5, January 2002.[SDR][BUILDING] <br /> 81. Winterizing — If construction is not complete by the start of the wet season (October 1 <br /> through April 30), the applicant shall implement a winterization program to minimize the <br /> potential for erosion and sedimentation. As appropriate to the site and status of <br /> construction, winterization requirements shall include inspecting/maintaining/cleaning all <br /> soil erosion and sedimentation controls prior to, during, and immediately after each storm <br /> event; stabilizing disturbed soils through temporary or permanent seeding, mulching, <br /> matting, tarping or other physical means; rocking unpaved vehicle access to limit dispersion <br /> of much onto public right-of-way; and covering/tarping stored construction materials, fuels, <br /> and other chemicals. Plans to include proposed measures to prevent erosion and polluted <br /> runoff from all site conditions shall be submitted for approval by CDD prior to beginning <br /> construction. As site conditions warrant, the City Engineer may direct the applicant to <br /> implement additional winterization requirements. [COA][ENGINEERING] <br /> 82. Archeological Resources - In the event that any deposits of prehistoric or historic <br /> archaeological materials are encountered during project construction activities, all work <br /> within an appropriate buffer area shall be stopped and a qualified archaeologist <br /> meeting Federal criteria under 36 CFR 61 shall be contacted to assess the deposit and <br /> make recommendations, possibly including complete avoidance of the resources, in- <br /> place preservation, and/or data recovery.[SDR][PLANNING] <br /> 83. Paleontological Resources — Prior to the issuance of grading or demolition permits, <br /> the Community Development Department, in coordination with a qualified <br /> paleontologist, shall assess the project for the potential to destroy unique <br /> paleontological resources and to determine provisions to protect such resources when <br /> applicable, possibly including complete avoidance of the resources, in-place <br /> ATTY/RES0.0027/PC RESO 2075 BROADWAY <br /> REV:04-18-16 VR <br /> Page 20 of 28 <br />