My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 Professional Pipe Services
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Agmt16 Professional Pipe Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2016 11:22:57 AM
Creation date
5/2/2016 11:22:56 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Professional Pipe Services
PROJECT NAME
CCTV Inspection of Swewer Lines Basins Nos 5G and DT 2
RMP File Number
304
Date
4/28/2016
MO Ref
16-066
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONTRACTOR s}�11 adherc to the most current Manual of Uniform Traffic Control Devices(MLTfCD) <br /> as amendtd by the California Department of Transportarions (Caltrans) for traffic control. All <br /> CONTRACT�R 5 trucks shall h�ve an arrow board and beacons as well as a full set of cones, candle <br /> sticks,and "Men at Work" signs and tripods that shall be used to provide safety for both employees and <br /> the general public. <br /> Confined Spaces <br /> If entry to confined spaces is necessary,the CONTRACTOR shall follow all appropriate local,state,and <br /> federal laws pertaining to confined space entries. Sanitary sewer manholes are considered confined <br /> spaces. Specific attention is directed also to OSHA safety rules, regulations and prec�utions to be taken <br /> by the Contractor before entering sanitary sewer manholes,and other sanitation structures with respect to <br /> physical and chemical hazards that may be present. <br /> Night Work <br /> If flow and/or traffic aze an issue for CONTRACTOR to complete�segment,arrangements will be made <br /> with City to work at night. CONTRACTOR shall provide businesses/residences two (2) working days <br /> prior notice of any potenrially disruptive activity. Addirional compensarion for night work will not be <br /> paid by the City. <br /> DELNERABLES: <br /> 1. Deliverables shall include CCTV inspection videos,pichues and databases in an external hard drive <br /> as mentioned herein; matthole inspection reports; printed CCTV inspection reports; summ�ry of <br /> CCTV inspection reports in excel format{see details below), color coded sewer basin site maps(see <br /> det�tils below);MPEG-4 forniat color videa <br /> 2. Submit summary of the CCTY inspection reports in excel format showing the following: inspection <br /> ID, pipe seginent reference, d�te of inspecrion, street name, upstream manhole no. designation, <br /> downstream manhole no.�signation,sewer use,direction of flow,flow control,size of pipe,type of <br /> pipe, shape of pipe, pipe joint length, total pipe lengkh, actual pipe length surveyed , pre-cleaning <br /> method use,weather condition and the overall pipe rating condition of the pipe segments(from MH <br /> to MI�indicating the following ratings 1 -if the pipe is in excellent condition,2 if the pipe is in good <br /> condition,3-if the pipe is in fair condition,4—if the pipe is in poor condition and 5 -if the pipe is in <br /> bad condition and needing immediate removal and replacement. <br /> 3. Submit a GIS with color coded sewer basin site map and a physical or PDF inap with the segments <br /> color coded by hand showing pipe segments (from manhole to manhole) pipe condition rate <br /> designation in color coding as follows; Pipe segments(from manhole to manhole)with 1 -excellent <br /> pipe raring condi6on in blue color;pipe segments with 2-ga�od pipe rating condition in green color; <br /> pipe segments with 3 -fair pipe rating condition in orange color, pipe seginents with 4 - poor pipe <br /> rating condition in purple color and pipe segments with 5 bad pipe rating condition in red color. <br /> DEADLINE: <br /> CONTRACTOR sha11 complete all work within one hundred and twenty(120)calendar days of the City's <br /> notice to proceed.CONTRACTOR shall put a third crew on this project if needed.CONTRACTOR sha11 <br /> average about 3,000 line�r feet per d�y,per crew,which shall s11ow CONTRACTOR to finish within the <br /> City's timeframe.COIVTRACTOR shall provide the City with a detailed work schedule,to include streets <br /> and dates,at City's request. <br /> REV:03-16-16 VR <br /> Page 11 of 12 <br /> ATTY/AC3R.2016.t}52/Professional Pipe Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.