My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 Professional Pipe Services
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Agmt16 Professional Pipe Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2016 11:22:57 AM
Creation date
5/2/2016 11:22:56 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Professional Pipe Services
PROJECT NAME
CCTV Inspection of Swewer Lines Basins Nos 5G and DT 2
RMP File Number
304
Date
4/28/2016
MO Ref
16-066
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PAYMENT TERMS: <br /> Contractor shall be uaid on N►e basis uf actu�l puantitv of work comuleted bASed on the cost <br /> schedWe ahown belvw aot to exceed 5229.840.30. The fee shall inelude a11 labor, materials, �nd <br /> equip�nt neeessary to clean and inspect manholes, cican and inspect sewer lines, implementing traffic <br /> control,procuring water,disposing of debris,and delivering hard drive�s noted. <br /> TEM 3CRIPT�N TY NIT ICE OTAL <br /> 1 n and video ins ot 8"di�meter 4 900 1.85 7 565.00 <br /> n and video n at 8"diameter 7 983 1.85 287.06 <br /> an and video in of 10'dtameter 499 F 1.85 323.15 <br /> an snd vid�o o�of 12"dFameter 7S3 F 1.85 10 643.05 <br /> an and vkSeo ins n of 15'diameter 275 1.85 2(J8.75 <br /> b ot�l 420 02T.00 <br /> . � <br /> an arM vkleo ina n of B"dfameter 'S� 1.85 1 002.65 <br /> ean and vtdeo k►a n o18"diameter 7 946 F 1.85 2QU.10 <br /> ean�nd video�s n at 10"c�ameter 713 1.85 719.05 <br /> ean and video kis of 12'�fameter 823 F 1.a5 322.55 <br /> 10 ean and ' �t.s of 45'diameter Q04 F 1.85 .40 <br /> 11 eart and �a n of 16'�ter 1 355 1.85 .75 <br /> 12 and vid�o�s 1 'c�ameter 1 246 1.85 510 <br /> 13 n a �ts ot `di er 7 1.85 <br /> 14 n k� of T ter 340 F 1.85 17 . <br /> 15 nd in �iameter 148 L <br /> 6 an a 333' ter 313 1.85 79.05 <br /> 17 a � " er 1 1.85 <br /> 18 arxi vtdeo�s d 4 c�meter 8 1.85 l.80 <br /> 9 n a video in tn 48"ca�neter 1.e5 7 <br /> b I 81a F 44S 813.a0 <br /> RAN�TOTAL 5229,840.30* <br /> Basin No.SG-45,42p linear feet <br /> 3 Man Crew with Vacuum Truck,CCT'V Unit&Pickup Truck-500 man-hours to complete. <br /> Basin No.DT2-78,8181inear feet <br /> 3 M�n Crew with Vacuum Truck,CCTV Unit&Pickup Truck-875 man-hours to complete. <br /> *Costs Includes mobilization, 8 hours on job with traffic control setup,getting water for cleaning truck, <br /> disposal of debris, disposal of hazardous materials (if there's any) as well as clean and CCTV of sewer <br /> lines and any other incidentals. <br /> Total Contract Amount: 5229,840.30 <br /> REV:03-16-16 VR <br /> Page 12 af 12 <br /> ATTY/AGR.2016.052lProfessional Pipe Servlces <br />
The URL can be used to link to this page
Your browser does not support the video tag.