My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2016-05-09 Interview, Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2016
>
AgdaPkt 2016-05-09 Interview, Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2016 10:55:58 AM
Creation date
5/5/2016 6:00:16 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/9/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
478
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
9.B - Page 7 <br /> 3. Ferrari Property, Water Dependent Development-2 (WD-2) & Open Space — <br /> Wetland (OS-W) The Ferrari Property is located north of the Inner Harbor land- <br /> side area, adjacent to the Graniterock facility and Seaport Centre. The Draft <br /> IHSP would allow: <br /> a. Residential uses: 8 units/acre + an additional 2 units/acre with an <br /> approved community benefits plan <br /> b. Maximum height of 30 feet <br /> c. On the OS-W portion of the site, only low scale buildings compatible with <br /> the open space nature of the site would be allowed; floor area of 25% <br /> maximum. <br /> The City has not received a formal development application for this site. <br /> However, this site is generally considered to be the best site for a floating home <br /> community. Residential density of approximately 100 units may be possible, with <br /> additional units possible under an alternative scenario studied in the Draft EIR. <br /> Draft Environmental Impact Report <br /> The City has prepared a Draft EIR for Draft IHSP and HVP project under all relevant <br /> sections of the California Environmental Quality Act (CEQA). The Draft EIR informs <br /> Redwood City decision makers, responsible agencies, and the public of the potential <br /> environmental effects associated with the IHSP and HVP project. <br /> The Draft EIR identified potential significant impacts for the Specific Plan in the areas of <br /> Aesthetics, Air Quality, Biological Resources, Cultural Resources, Geology and Soils, <br /> Greenhouse Gas Emissions and Energy, Hazards and Hazardous Materials, Hydrology <br /> and Water Quality, Land Use and Planning, Noise, Population, Housing and <br /> Employment, Public Services and Recreation, Utilities and Service Systems, and <br /> Transportation and Traffic. <br /> A summary of the environmental impacts associated with the Draft OHSP is provided in <br /> the December 1, 2015 Planning Commission staff report. <br /> Harbor View Place <br /> The Jay Paul Company submitted a proposal to development a commercial office <br /> project within the Inner Harbor area. This project is known as Harbor View Place (HVP). <br /> The HVP project encompasses the easternmost portion of the proposed IHSP area — <br /> specifically the IH-2 district (the former Malibu Grand Prix site) and an additional parcel <br /> (Lyngso) located outside of the IHSP area, at the southwest corner of the intersection of <br /> Seaport Boulevard and Blomquist Street. Given the proposed development extends <br /> beyond the boundaries of the IHSP, and exceeds the development standards, the <br />
The URL can be used to link to this page
Your browser does not support the video tag.