My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt00 CH2MHILL
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2000
>
Agmt00 CH2MHILL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2005 10:48:49 AM
Creation date
4/23/2002 9:58:48 AM
Metadata
Fields
Template:
Agreement
Contractor Name
CH2MHILL
PROJECT NAME
EIR Redwood Shores Bayfront Specific Plan
RMP File Number
304
Date
9/13/2000
Reso Ref
14047 14429
Amendment
Yes
Box
6037
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
08/24/00 12:32 FAX CH2M HILL SJC ~00~ <br /> <br /> EXHIBIT A <br /> <br /> SCO~E OF WORK AND ~EE ESTIMATE. <br /> <br /> ENVIRONMENTAL DONATION FOR <br /> REDWOOD SHORES BAYFROHT SPECIFIC PLAN <br /> <br /> PROIECT BACKGROUND <br /> <br /> The City of Redwood City is the Lead Agency for preparation of the Redwood Shores <br /> Bayfront Spet4~c Plan. Preparation of this plan is a requirement of the Redwood Shores <br /> Bayfiront (RSB) zoning district, which is comprised of three adjoining parcels of land totaling <br /> 67.4 acres near the easterly tip of Redwood Shores. The owners of the three properties <br /> include: 1) South Bayside System Authority (SBSA); 2) Fully Alive Christian Church <br /> (FACC), previously owned by KGEI radio station; and 3) Susquehanna San Francisco, <br /> owners of the KA]BR radio station property. <br /> <br /> FACC received a Conditional Use P~n,~t from the City of Redwood City irt tnid-1999 to <br /> allow church-related uses on their parcel This approval prompted [he requirement for <br /> preparation of the Spec~Sc Plan. The initial draft of the Specific Plan is anticipated to be <br /> completed by the end of October, 2000, with completion of the final draft expected by the <br /> end of November, 2000. Stonybrook Associates, Inc. has been retained to prepare the draft <br /> Spe_~c Plan_ The Specific Plan constitutes a "project" under the C~l~ornia Environmental <br /> Quality Act (CEQA); therefore, environmental review of the Specific Plan must occur prior <br /> to J.ts adoption by the City. CH2M HILL will be retained to prepare the CEQA document(s) <br /> for tlm project and conduct the environmental review process. <br /> <br /> The RSB Specific Plan will establish the location, intensity, and character of the land uses to <br /> be pertained within the boundary of the Specific Plan; development s~mdards; the <br /> circulation pattern; and the necessary infrasm~ture improvements to support development <br /> within the Specific Plan area. The Specific Plan will also consist of the objectives, policies, <br /> design guidelines, end implementation measures to direct development within the Specific <br /> Plan area. The Specific Plan will be adopted as an amendment to the Redwood City General <br /> Plan, and win establish policies speH~c to the area covered by the Plan. <br /> <br /> ENVIRONMENTAL REVIEW <br /> <br /> The City of Redwood C,~ty (City) anticipates that an Environmental Impact Report (EIR) <br /> may be required as the appropriate environmental document for the project. However, in <br /> accordance with CEQA, an Initial Study will first be prepared to determine the poter~tial <br /> significance of environmental impads a~odated with development under the Specific Plan. <br /> If the Ini~] Study indicates that environmental impacts can be reduced to a less;than- <br /> sign~cant level through mitigation measures that can be incorporated into the project, the <br /> City may decide to prepare a Mitigated Negative Declaration (MAID) instead of an <br /> <br /> To the exter~t possible, the environmental document wifl assess spec~c developmer~t <br /> proposals within the SpeCtre Plan. However, these specific proposals may not be developed <br /> ~o the level of detail that would permit a project-level of environmental rcview. Therefore, <br /> the envh'onmental document would assess the Specific Plmx at a programmatic level. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.