My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt00 CH2MHILL
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2000
>
Agmt00 CH2MHILL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2005 10:48:49 AM
Creation date
4/23/2002 9:58:48 AM
Metadata
Fields
Template:
Agreement
Contractor Name
CH2MHILL
PROJECT NAME
EIR Redwood Shores Bayfront Specific Plan
RMP File Number
304
Date
9/13/2000
Reso Ref
14047 14429
Amendment
Yes
Box
6037
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
08/24/00 12:33 FAX CH2M HILL SJC ~004 <br /> <br /> analyses required to complete the environmental documentation process. Depending on the <br /> results o£ the Ini~nl Study, these additional technical analyses, which could be prepared for <br /> either an M2N-D or an EIR, may include: traffic study, blologlcal surveys, <br /> delineation, noise measurements and mod,ling, air q~ m lity mxalysis, geotechnical <br /> investigation, Phase I Environmental Site Assessment, visual simulations, etc. The scope of <br /> work for these analyses will be defined for Task 2 of the Scope of Services. <br /> <br /> We will submit the d_raft Initial Study for internal review by the City of Red.wood Cfty and <br /> the Oversight Committee. We will also present the results of the In~l Study to the <br /> Oversight Committee at one of its reg~_,l~dy scheduled meetings. We will assist the City of <br /> Redwood City and the Oversight Committee in determlrring if the appropriate <br /> envirorrmental document w~. be an MND or an EIR. <br /> <br /> Meetfngs: Attendance at kick-off meeting, one Redwood City Pla~.t~Jrtg Cornn~fssfon <br /> study session, and four RSB Oversight' Committee meetings. <br /> Deliverables: Draft and final project description; draft Ini~l Study (20 copies of each <br /> document) <br /> <br /> Tasks 2 through 5: Scopes of work for these tasks will be developed upon completion of <br /> Task 1. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.