My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 Bottom Duvivier (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 Under $60K
>
Agmt04 Bottom Duvivier (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2008 4:42:06 PM
Creation date
8/2/2004 8:48:49 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Bottom Duvivier
PROJECT NAME
architectural structural design services
RMP File Number
304.5
Date
7/21/2004
Box
6585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />City of Redwood City <br />Herkner Pool Renovation <br />January 5, 2004 <br />Revised May 28, 2004 <br />Construction Documents <br />Once the schematic phase is completed and approved by the City, we will prepare permit and <br />contract documents. The documents will show the extend of repair work, the detail and materials <br />used. <br />e el v obi s <br /> Contract documents, including drawings and technical specification sections for City to obtain <br /> bids and permit. <br />Permit submittal and review <br />We assume application for a construction permit will be by city staff and the extent of our <br />involvement will be to respond to requests for clarification or discussion of compliance strategies. <br />Bidding process and review <br />We are assuming the expertise of city staff does not require our services to review and interpret bids. <br />Should our participation to review bids or alternate proposals be requested, we will participate on an <br />additional services basis. <br />Construction Administration <br />Upon commencement of construction, we will provide construction observation services on an on <br />call basis. Again, in the interest of minimizing the cost of consulting services, we assume city staff has <br />the expertise to routinely monitor the contractor's progress and compliance with the contract <br />documents. <br />The Pro s <br />. Bottom Duvivier will attend project meetings and site visits, as requested, up to the allowance <br /> authorized. <br />. One job site visit by Rivero Consulting Group <br />. Review the General Contractor's punch list and append to it any additional items observed. <br />. Our supplement to the general contractor's punch list. <br /> Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.