My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 Bottom Duvivier (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 Under $60K
>
Agmt04 Bottom Duvivier (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2008 4:42:06 PM
Creation date
8/2/2004 8:48:49 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Bottom Duvivier
PROJECT NAME
architectural structural design services
RMP File Number
304.5
Date
7/21/2004
Box
6585
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />City of Redwood City <br />He~nerPoolRenovatlon <br />January 5, 2004 <br />Revised May 28, 2004 <br />Pre-Design / Assessment <br />We will work with City of Redwood City staff to obtain existing drawings, specifications, submittals and <br />reports for Hekner Pool, for review by the Structural Engineer, Rivera Consulting Group Inc. A copy of <br />Rivera Consulting Group proposal is attached for your reference. <br />Bottom Duvivier and Rivera Consulting Group will perform a site visit, after existing document review, <br />to assess the overall problem, to evaluate the potential cause of problem and to establish the <br />direction for the repair design. <br />The Process <br /> Review of existing documents. <br />- A site review. <br /> Evaluate cause of problem <br /> Establish design direction <br />The Deliverab!es <br />- Record of site visit <br />Schematic Design <br />Based upon site assessment and design direction, Bottom Duvivier and Rivera Consulting Group will <br />develop a plan indicating extend of repair work and a detail showing the proposed repair solution, <br />for City to review and to approve. <br />We will provide optional tile materials to be incorporated with the repair work. <br />Tn Process <br />- Develop plan, detail and materials to be used for the repair work. <br /> Denv roble <br />- One pion showing pool layout and extend of repair work <br /> Detail for proposed repair work <br /> Floor tile samples, if used. <br /> Page 2 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.